List of contents
Installation and maintenance instructions
1
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1444099_00 – 07/2018 – EN
List of contents
Particular safety instructions .....................................................
Observing the instructions ..........................................
Meaning of warnings and symbols..............................
Safety instructions for installation and operation.......................
General .......................................................................
Intended use ...............................................................
Device installation room..............................................
Electrical installation ...................................................
Requirements for the heating water............................
Heating system and sanitary connection ....................
Operation ....................................................................
2 Handover to operator and warranty
Instruct the owner ......................................................................
Warranty conditions...................................................................
Design and components............................................................
Function of the 3-way switch valves ..........................................
Dimensions and connection dimensions ...................................
Transport and delivery...............................................................
Installing the heat pump ............................................................
Selecting the installation site....................................... 13
Installing the device .................................................... 14
Preparing the device for installation ..........................................
Remove the front screen............................................. 15
Remove the protective cover ...................................... 15
Moving the controller housing to the service position . 15
Open the controller housing........................................ 16
Removing the bottom thermal insulation..................... 16
Opening the vent valve ............................................... 17
Making the hood opening............................................ 18
Installing the rotary switch of the controller................. 19
Installing optional accessories...................................................
Installation of the electric backup heater..................... 19
Installation of the DB connection kit............................ 19
Installation of the P connection kit .............................. 20
Water connection ......................................................................
Connecting hydraulic lines .......................................... 20
Connecting the drain................................................... 21
Electrical connection .................................................................
Overall connection diagram ........................................ 23
Mains connection ........................................................ 24
General information on the electrical connection........ 24
Connecting the heat pump outdoor unit...................... 24
External switching contact .......................................... 25
EBA (external requirement request) ........................... 25
Connecting an external heat generator....................... 25
Connecting the room thermostat................................. 26
Connection of optional RoCon system components ... 27
Connecting the HP convector ..................................... 27
Connecting switching contacts (AUX outputs) ............ 28
Off-peak mains connection (HT/NT) ........................... 28
Connecting an intelligent controller (Smart Grid - SG)
Connection for refrigerant........................................................... 29
Laying refrigerant lines................................................. 29
Pressure test and filling the refrigerant circuit.............. 30
Filling the system........................................................................ 30
Filling hot water heat exchangers ................................ 30
Filling the storage tank................................................. 30
Filling the heating system ............................................ 30
Initial commissioning .................................................................. 31
Requirements............................................................... 31
Starting the unit and start-up........................................ 31
Bleeding the hydraulic system ..................................... 31
Checking the minimum flow ......................................... 32
Re-commissioning ...................................................................... 32
Requirements............................................................... 32
Start-up ........................................................................ 33
Hydraulic system connection...................................................... 34
General overview of inspection and maintenance...................... 36
Inspection and maintenance tasks ............................................. 37
Filling, topping up the storage tank .............................. 37
Filling, topping up the heating system.......................... 38
Troubleshooting.......................................................................... 40
Overview of possible malfunctions ............................................. 40
Fault codes ................................................................................. 43
Emergency operation ................................................................. 53
Temporary shutdown.................................................................. 54
Draining the storage tank............................................. 54
Draining the heating circuit and hot water circuit ......... 55
Final shutdown and disposal ...................................................... 55
Basic data................................................................................... 57
Characteristic lines ..................................................................... 58
Sensor characteristic lines ........................................... 58
Characteristic curves for pumps .................................. 59
Tightening torque ....................................................................... 59
Minimum floor area and ventilation openings ............................. 59
Electrical connection diagram .................................................... 61