8
|
Piping installation
Installer reference guide
70
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10
Counterclockwise to open
Clockwise to close
3
When the stop valve CANNOT be turned any further, stop turning.
4
Install the stop valve cover.
Result:
The valve is now open/closed.
To handle the stem cap
▪
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
▪
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Tightening torque (N∙m)
Stem cap, liquid side
14.2~17.2
Stem cap, gas side
22~28
To handle the service cap
▪
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
▪
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Tightening torque (N∙m)
Service port cap
11~14
8.2.8 To connect the refrigerant piping to the outdoor unit
▪
Piping length.
Keep field piping as short as possible.
▪
Piping protection.
Protect the field piping against physical damage.
1
Connect the liquid refrigerant connection from the indoor unit to the liquid
stop valve of the outdoor unit.
a
c
b
a
Liquid stop valve
b
Gas stop valve
c
Service port