
Operation methods
52
Conducting test operation
Test operation can be accessed from the SETTINGS menu.
1
[SETTINGS screen]
2
To start
1
Tap “Test Operation” in the menu on
the left.
2
Tap
to start test operation.
•
The screen will automatically change to
the HOME screen.
•
Initially, the test operation sign “
” will
light up in white on all the Group monitoring
panels. After that, only the Groups that had
been operating before starting test
operation will undergo test operation, and
their test operation signs will remain lit for
about 30 minutes.
[HOME screen]
If you want to cancel, tap
.
Note:
•
For test operation, refer to the installation
manual for the outdoor unit also.
•
This function may not be available depending
on the type of outdoor unit.