4 Operation
Operation manual
12
EABH/X16DF6V(7)+9W(7) + EAVH/
X16S(U)18+23DA6V(7)+9W(7)
Daikin Altherma 3 H F+W
4P644480-1A – 2021.09
8
Select
Paste
.
Result:
Mon
Sat
Wed
Fri
Thu
Tue
Sun
User defined 1
C
To rename the schedule
1
Select the name of the current schedule.
Mon
Sat
Wed
Fri
Thu
Tue
Sun
User defined 1
2
Select
Rename
.
Delete
Rename
Select
3
(optional) To delete the current schedule name,
browse through the character list until
←
is
displayed, then press to remove the previous
character. Repeat for each character of the schedule
name.
4
To name the current schedule, browse through the
character list and confirm the selected character.
The schedule name can contain up to 15 characters.
5
Confirm the new name.
INFORMATION
Not all schedules can be renamed.