Configuration
Installation manual
27
BRR9B1V1
Communication box
4P617761-1 – 2020.04
Slave
address
DS1
DS2
Remarks
1
2
3
4
1
2
3
4
1
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
—
2
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
3
OFF
OFF
OFF
OFF
OFF
OFF
ON
ON
…
26
OFF
OFF
OFF
ON
ON
OFF
ON
OFF
…
245
ON
ON
ON
ON
OFF
ON
OFF
ON
Maximum
effective
address
3
If needed, set the terminating resistance. You can set this setting with 2 slide
switches (SS2, SS3). If both switches are "OFF" (default setting), the
terminating resistance is 0 Ω.
OFF
ON
SS2
12
0 Ω
SS3
10
0 Ω
SS2
12
0 Ω
SS3
10
0 Ω
8‒1 Example of slide switch settings when resistance is 120 Ω
OFF
ON
SS2
12
0 Ω
SS3
10
0 Ω
SS2
12
0 Ω
SS3
10
0 Ω
8‒2 Example of slide switch settings when resistance is 100 Ω
4
Check all transmission wiring (DIII weak current).
5
Check all transmission wiring (RS‑485 weak current) from the monitoring
system to the communication box.
6
Close the communication box cover when you turn ON the power supply.
7
Set the parity using the push buttons (BS1~BS5) on the A2P PCB of the
communication box. The table below shows the setting method. Set the parity
as specified by the monitoring system.
Procedure
LED indication
(a)
Remarks
H1P H2P H3P H4P H5P H6P H7P
Initial indication
Shows the initial indication in
normal conditions.
Press and hold BS1 for 5 seconds.
Make sure that the H1P LED has
turned ON.
Press BS2 2 times.
Check the pressing count against
the LED indication.
Press BS3 once.
Indicates the last setting status.
Press BS2 to
select the
desired setting.
None
Factory setting
Odd
—
Even
Press BS3 once.
The LED indication will change
from flashing to ON.
Summary of Contents for BRR9B1V1
Page 1: ...Installation manual Communication box BRR9B1V1 ...
Page 37: ......
Page 38: ......
Page 39: ......