![Daikin BRR9B1V1 Installation Manual Download Page 14](http://html.mh-extra.com/html/daikin/brr9b1v1/brr9b1v1_installation-manual_501402014.webp)
6
|
Unit installation
Installation manual
14
BRR9B1V1
Communication box
4P617761-1 – 2020.04
6.3.2 To install the communication box
1
Drill 4 holes at the fixing points.
a
a
a
a
515
529
100
120
b
40
87
(mm)
a
Hole for a M5 self-tapping screw (4 fixing points)
b
Wiring intake
2
Secure the communication box using 4 screws (field supply).
INFORMATION
Install the communication box on a sufficiently strong wall using fixing screws (field
supply) suitable for the wall.
INFORMATION
▪
Make sure that the wiring intakes face downward.
▪
Make sure that dew or rainwater will not drop on the field wiring.
▪
Provide traps in front of the wiring intakes.
Summary of Contents for BRR9B1V1
Page 1: ...Installation manual Communication box BRR9B1V1 ...
Page 37: ......
Page 38: ......
Page 39: ......