Si18-797
BP Unit
Removal Procedure
29
4
Remove the sealing
compound (1) of the
pipe insulation sleeves.
The sealing compound (1) is a
servicing part.
5
Remove the putty.
6
Cut off the clamp.
The clamp is to be kept in stock.
Step
Procedure
Points
Sealing compound (1)
(Q0512)
(Q0513)
(Q0514)
(Q0528)
Clamp