BP Unit
Si18-797
28
Removal Procedure
2.2
Removal of Solenoid Valve Coil
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the PCB.
Preparations
Take the steps for removing the
PCB.
Press the fixture between your
fingers to unhook.
1
Remove the legged
clamp from the wire
harness.
2
Remove the 4 screws
off the electrical box
mounting plate. Lift the
plate up to detach it.
3
Remove the 4 screws
off the bottom plate.
(Q0509)
(Q0510)
(Q0511)