![Daikin BAEF125AWB Operation Manual Download Page 12](http://html1.mh-extra.com/html/daikin/baef125awb/baef125awb_operation-manual_3260310012.webp)
11
Warranty and After-sales Service
Guideline for the replacement cycle of consumable parts
[Note that replacement cycle does not indicate warranty period.]
•
Table 2. List of “replacement cycles”
Main part name
Inspection cycle
Replacement cycle
Pleated filter
6 months
1 year
UV unit
1 year
7 years
Streamer unit
7 years
Fuse
10 years
NOTE 1. This table shows the main parts. For details, check based on the maintenance contract.
NOTE 2. This replacement cycle indicates the approximate period until the replacement to ensure long and safe use of the product.
Use it for appropriate maintenance design (budgeting the part replacement costs and the like).
NOTE 3. The replacement cycle for the UV and streamer units depends on the operating hours.
Relocation and disposal
When relocating the UV streamer air purifier unit due to moving or other reasons, since it requires specialized skills, consult your
dealer or the contact centre.
• When disposing of the product, do so properly in accordance with local regulations.
01_EN_3P701969-3.indd 11
01_EN_3P701969-3.indd 11
17/05/2023 09:18:58
17/05/2023 09:18:58
Summary of Contents for BAEF125AWB
Page 85: ...12 07_EL_3P701969 3 indd 12 07_EL_3P701969 3 indd 12 17 05 2023 09 07 41 17 05 2023 09 07 41...
Page 98: ...1 2 09_RU_3P701969 3 indd 1 09_RU_3P701969 3 indd 1 17 05 2023 09 13 29 17 05 2023 09 13 29...
Page 99: ...2 09_RU_3P701969 3 indd 2 09_RU_3P701969 3 indd 2 17 05 2023 09 13 29 17 05 2023 09 13 29...
Page 100: ...3 09_RU_3P701969 3 indd 3 09_RU_3P701969 3 indd 3 17 05 2023 09 13 30 17 05 2023 09 13 30...
Page 102: ...5 11 09_RU_3P701969 3 indd 5 09_RU_3P701969 3 indd 5 17 05 2023 09 13 32 17 05 2023 09 13 32...
Page 109: ...12 09_RU_3P701969 3 indd 12 09_RU_3P701969 3 indd 12 17 05 2023 09 13 32 17 05 2023 09 13 32...