![background image](http://html.mh-extra.com/html/daikin/at24kv2s/at24kv2s_service-manual_501359019.webp)
Si041144
Removal of PCBs
Removal Procedure
17
4. Remove the control PCB.
1
Unfasten the 3 hooks.
Lift up and remove the
control PCB.
2
Pull out the earth wire
from the terminal board.
3
Pull out the terminals
from the terminal board.
Step
Procedure
Points
(R9517)
Hook
Hook
Control PCB
(R17243)
Earth
wire
(R9519)
Terminal