![background image](http://html.mh-extra.com/html/daikin/at09hv2s/at09hv2s_service-manual_501358017.webp)
Si04-751
Removal of PCBs
Removal Procedure
15
3
4
Slide the electrical box
cover to the left and
remove it.
Disconnect the wire
harnesses.
5. Remove the signal
receiver PCB.
1
Unfasten the 3 hooks
and remove the signal
receiver PCB.
2
Disconnect the
connector [S29] from
the signal receiver
PCB.
Step
Procedure
Points
Electrical
box cover
Hook
Hook
(R4358)
(R4359)
Hook
Hook
Hook
Signal receiver PCB
(R4361)
(R15506)
[S29]