background image

English

8

Outdoor Unit Installation

6.

Refilling the refrigerant

Check the type of refrigerant to be used on the machine nameplate.

Fill from the gas pipe in liquid form.

NOTE

National implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official 
national language on the unit. Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit. 
Sticking instructions are illustrated on the backside of that label. 

7.

Refrigerant piping work

7-1 Cautions on pipe handling

1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender 

for bending.

7-2 Selection of copper and heat insulation materials

When using commercial copper pipes and fittings, observe the following:
1) Insulation material:  Polyethylene foam 

Heat transfer rate:  0.041 to 0.052W/mK (0.035 to 0.045kcal/(mh •°C))
Refrigerant gas pipe’s surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.

2) Be sure to insulate both the gas and liquid piping and to provide insulation 

dimensions as below.

3) Use separate thermal insulation for gas and liquid refrigerant pipes.

Gas side

Liquid side

Gas pipe 

thermal insulation

Liquid pipe 

thermal insulation

O.D. 12.7mm

O.D. 6.4mm

I.D. 14-16mm

I.D. 8-10mm

Minimum bend radius

Thickness 10mm Min.

40mm or more

30mm or more

Thickness 0.8mm (C1220T-O)

R32

Please fill in with indelible ink, 

  the factory refrigerant charge of the product, 
  the additional refrigerant amount charged in the field and

  the total refrigerant charge 

on the refrigerant charge label supplied with the product.

Important information regarding the refrigerant used

This product contains fluorinated greenhouse gases covered 
by the Kyoto Protocol. Do not vent gases into the atmosphere.

Refrigerant type: 

R32

GWP  value: 

675

GWP = global warming potential 

factory refrigerant charge of the 
product: 
see unit name plate 

additional refrigerant amount 
charged in the field 

total refrigerant charge 

Contains fluorinated greenhouse 
gases covered by the Kyoto 
Protocol

outdoor unit

refrigerant cylinder and manifold 
for charging

The filled out label must be adhered in the 
proximity of the product charging port 
(e.g. onto the inside of the stop valve cover).

Wall

If no flare cap is 
available, cover the 
flare mouth with 
tape to keep dirt 
or water out.

Be sure to 
place a cap.

Rain

Gas pipe

Inter-unit wire

Liquid pipe

Drain hose

Finishing tape

Gas pipe 

insulation

Liquid pipe 

insulation

Summary of Contents for ARXM50MV1B

Page 1: ...systeem Nederlands Manual de instalación Serie Split R32 Español Manuale d installazione Serie Multiambienti R32 Italiano Εγχειρίδιο εγκατάστασης ιαιρούμενης σειράς R32 Ελληνικά Manual de Instalação Série split R32 Portugues Руководство по монтажу Серия R32 с раздельной установкой Русский Montaj kılavuzları R32 Split serisi Türkçe Models RXM42LV1B RXM50LV1B RXJ50LV1B RXM42MV1B RXM50MV1B RXJ50MV1B ...

Page 2: ...positivamente da B secondo il Certificato C 07 ȈȘȝİȓȦıȘ ȩʌȦȢ țĮșȠȡȓȗİIJĮȚ ıIJȠ A țĮȚ țȡȓȞİIJĮȚ șİIJȚțȐ Įʌȩ IJȠ B ıȪȝijȦȞĮ ȝİ IJȠ ȆȚıIJȠʌȠȚȘIJȚțȩ C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 ɉɪɢɦɟɱɚɧɢɟ ɤɚɤ ɭɤɚɡɚɧɨ ɜ A ɢ ɜ ɫɨɨɬɜɟɬɫɬɜɢɢ ɫ ɩɨɥɨɠɢɬɟɥɶɧɵɦ ɪɟɲɟɧɢɟɦ B ɫɨɝɥɚɫɧɨ ɋɜɢɞɟɬɟɥɶɫɬɜɭ C 10 Bemærk som anført i A og positivt vurderet af B i henhold til Cer...

Page 3: ...neato nel A e giudicato positivamente da B secondo il Certificato C 07 Σημείωση όπως καθορίζεται στο A και κρίνεται θετικά από το B σύμφωνα με το Πιστοποιητικό C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 Примечание как указано в A и в соответствии с положительным решением B согласно Свидетельству C 10 Bemærk som anført i A og positivt vurdere...

Page 4: ...sion lead as this may cause overheating electric shocks or fire Make sure that all wiring is secured the specified wires are used and that there is no strain on the terminal connections or wires Improper connections or securing of wires may result in abnormal heat build up or fire When wiring the power supply and connecting the wiring between the indoor and outdoor units position the wires so that...

Page 5: ...TE Cannot be installed hanging from ceiling or stacked CAUTION Do not install the air conditioner at any place where there is a danger of flammable gas leakage In the event of a gas leakage build up of gas near the air conditioner may cause a fire to break out While following the instructions in this installation manual install drain piping to ensure proper drainage and insulate piping to prevent ...

Page 6: ...ion side facing the wall Never install the outdoor unit at a site where the suction side may be exposed directly to wind To prevent exposure to wind it is recommended to install a baffle plate on the air discharge side of the outdoor unit In heavy snowfall areas select an installation site where the snow will not affect the unit Construct a large canopy Construct a pedestal Install the unit high e...

Page 7: ...ntres From unit s side Max allowable piping height Min allowable piping length Max allowable piping length 30m 1 5m 20m Liquid pipe Gas pipe O D 6 4mm O D 12 7mm 20g m Additional refrigerant required for refrigerant pipe exceeding 10m in length Be sure to add the proper amount of additional refrigerant Failure to do so may result in reduced performance The suggested shortest pipe length is 1 5m in...

Page 8: ...he foundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necessary follow the procedures below 2 Drain work 1 Use drain plug for drainage 2 If the drain port is covered by a mounting base or floor surface place additional foot bases of at...

Page 9: ...rque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches A A Cut exactly at right angles Remove burrs Set exactly at the position shown below Flaring Die Check Flare s inner surface must be flaw free The pipe end must be evenly fl...

Page 10: ...gh 4 1 Connect projection side of charging hose which comes from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and make sure that the compound pressure gauge reads 0 1MPa 76cmHg 1 4 Close gauge manifold s low pressure valve...

Page 11: ...parate thermal insulation for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 12 7mm O D 6 4mm I D 14 16mm I D 8 10mm Minimum bend radius Thickness 10mm Min 40mm or more 30mm or more Thickness 0 8mm C1220T O R32 Please fill in with indelible ink the factory refrigerant charge of the product the additional refrigerant amount charg...

Page 12: ...nd 15 minutes To stop the operation press the indoor unit ON OFF switch Using the indoor unit s remote controller 1 Press MODE button and select the cooling mode 2 Press ON OFF button to turn on the system 3 Press both the TEMP button and MODE button at the same time 4 Press MODE button twice will be displayed and the unit will enter forced cooling operation Forced cooling operation will stop auto...

Page 13: ...de the product Do not branch the power for the drain pump etc from the terminal block Doing so may cause electric shock or fire Be sure to install an earth leak detector One that can handle higher harmonics This unit uses an inverter which means that it must be used an earth leak detector capable handling harmonics in order to prevent malfunctioning of the earth leak detector itself Use an all pol...

Page 14: ...rimp style terminal for connection to the power supply terminal block Place the round crimp style terminals on the wires up to the covered part and secure in place 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Power supply terminal block Shape wires so that the service lid and stop valve cover fit securely Service lid Screw Good Stripping wir...

Page 15: ...E R T THERMISTOR DS DIPSWITCH RC RECEIVER E H HEATER S C LIMITSWITCH F U FU FORCHARACTERISTICS REFERTOPCBINSIDEYOURUNIT FUSE S L FLOATSWITCH FG CONNECTOR FRAMEGROUND S NPH PRESSURESENSOR HIGH H HARNESS S NPL PRESSURESENSOR LOW H P LED V L PILOTLAMP LIGHTEMITTINGDIODE S PH HPS PRESSURESWITCH HIGH HAP LIGHTEMITTINGDIODE SERVICEMONITORGREEN S PL PRESSURESWITCH LOW IES INTELLIGENTEYESENSOR S T THERMOS...

Page 16: ... air conditioner requires a small amount of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off the power to the air conditioner the system will restore the original operation mode when the circuit breaker is opened again 2 Test items Test items Sy...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...3P386698 1C 2015 07 Copyright 2014 Daikin ...

Reviews: