10 Troubleshooting

Installation manual

13

ARXF20~42E5V1B
R32 split series
3P650253-12H – 2022.10

3

Power up the unit.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The following 

field wiring

 has been carried out according

to  this  document  and  the  applicable  legislation  between
the outdoor unit and the indoor unit.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

9.2

Checklist during commissioning

To perform an 

air purge

.

To perform a 

test run

.

9.3

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

INFORMATION

▪ Even if the unit is turned OFF, it consumes electricity.

▪ When the power turns back on after a power break, the

previously selected mode will be resumed.

9.4

Starting up the outdoor unit

See  the  indoor  unit  installation  manual  for  configuration  and
commissioning of the system.

10

Troubleshooting

10.1

Fault diagnosis using LED on
outdoor unit PCB

LED is…

Diagnosis

flashing

Normal.

▪ Check the indoor unit.

ON

▪ Turn  the  power  OFF  and  back  ON,  and

check  the  LED  within  approximately  3
minutes.
If  the  LED  is  ON  again,  the  outdoor  unit
PCB is faulty.

OFF

1

Supply voltage (for power saving).

2

Power supply fault.

3

Turn  the  power  OFF  and  back  ON,  and
check  the  LED  within  approximately  3
minutes.

If the LED is OFF again, the outdoor unit
PCB is faulty.

DANGER: RISK OF ELECTROCUTION

▪ When the unit is NOT operating, the LEDs on the PCB

are turned OFF in order to save power.

▪ Even  when  the  LEDs  are  OFF,  the  terminal  block  and

the PCB may be powered.

11

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

▪ Units are marked with the following symbol:

This  means  that  electrical  and  electronic  products  may  NOT  be
mixed  with  unsorted  household  waste.  Do  NOT  try  to  dismantle
the  system  yourself:  dismantling  the  system,  treatment  of  the
refrigerant,  of  oil  and  of  other  parts  MUST  be  done  by  an
authorised installer and MUST comply with applicable legislation.

Units MUST be treated at a specialised treatment facility for reuse,
recycling  and  recovery.  By  ensuring  this  product  is  disposed  of
correctly, you will help to prevent potential negative consequences
for  the  environment  and  human  health.  For  more  information,
contact your installer or local authority.

Summary of Contents for ARXF20E5V1B

Page 1: ...Installation manual R32 split series English Installation manual R32 split series ARXF20E5V1B ARXF25E5V1B ARXF35E5V1B ARXF42E5V1B ...

Page 2: ...ва и или регламент и при условие че продуктите се използват в съответствие с нашите инструкции atitinka toliau nurodytas direktyvas arba reglamentus su sąlyga kad gaminiai bus eksploatuojami laikantis mūsų instrukcijų atbilst šādām direktīvām vai regulām ja vien šie izstrādājumi tiek lietoti saskaņā ar mūsu instrukcijām sú v zhode s nasledujúcou imi smernicou ami alebo predpisom mi za predpokladu ...

Page 3: ...are used in accordance with our instructions as amended S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 1091 Electromagnetic Compatibility Regulations 2016 S I 2008 1597 Supply of Machinery Safety Regulations 2008 following the provisions of BS EN 60335 2 40 A B C TCF032E25 as set out in A and judged positively by B according to the Certificate C Daikin Europe N V is authorised...

Page 4: ...ical data 14 12 1 Wiring diagram 14 12 1 1 Unified wiring diagram legend 14 12 2 Piping diagram 16 12 2 1 Piping diagram Outdoor unit 16 1 About the documentation 1 1 About this document WARNING Make sure installation servicing maintenance repair and applied materials follow the instructions from Daikin including all documents listed in Documentation set and in addition comply with applicable legi...

Page 5: ...n This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT re use flares Use new flares to prevent refrigerant gas leakage Use flare nuts that are included with the unit Using different flare nuts may cause refrigerant gas leakage CAUTION Do NOT open the valves before flarin...

Page 6: ...al insulation as such pipes will be very hot DANGER RISK OF ELECTROCUTION All electrical parts including thermistors are powered by the power supply Do NOT touch them with bare hands DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The voltage MUST be less ...

Page 7: ...installation servicing maintenance and repair comply with instructions from Daikin and with applicable legislation and are executed ONLY by authorised persons 4 1 1 Installation site requirements of the outdoor unit Mind the following spacing guidelines 1200 150 150 50 300 300 mm mm a b b a a Air outlet b Air inlet It is recommended to install a baffle plate when the air outlet is exposed to wind ...

Page 8: ...d climate take adequate measures so that the evacuated condensate CANNOT freeze NOTICE If the drain holes of the outdoor unit are blocked up by a mounting base or floor surface place additional foot bases 30 mm under the outdoor unit s feet INFORMATION For information on the available options contact your dealer 1 Use a drain plug for drainage 2 Use a Ø16 mm hose field supply a c b d a Drain port ...

Page 9: ...ng Make sure the outdoor and indoor unit are mounted Typical workflow Connecting the refrigerant piping involves Connecting the refrigerant piping to the indoor unit Connecting the refrigerant piping to the outdoor unit Insulating the refrigerant piping Keeping in mind the guidelines for Pipe bending Flaring pipe ends Using the stop valves 5 2 2 Precautions when connecting the refrigerant piping D...

Page 10: ...charging additional refrigerant make sure the outdoor unit s external refrigerant piping is checked leak test vacuum drying INFORMATION Depending on the units and or the installation conditions it might be necessary to connect electrical wiring before you can charge refrigerant Typical workflow Charging additional refrigerant typically consists of the following stages 1 Determining if and how much...

Page 11: ...rying 1 Connect the refrigerant cylinder to the service port 2 Charge the additional refrigerant amount 3 Open the gas stop valve 6 6 To fix the fluorinated greenhouse gases label 1 Fill in the label as follows b Contains fluorinated greenhouse gases 2 1 1 1 2 2 kg tCO2 eq GWP kg 1000 kg kg GWP XXX RXXX a f c d e a If a multilingual fluorinated greenhouse gases label is delivered with the unit see...

Page 12: ...r 220 240 V Recommended field fuse 16 A Earth leakage circuit breaker MUST comply with applicable legislation 7 2 To connect the electrical wiring to the outdoor unit 1 Remove the service cover 2 Open the wire clamp 3 Connect the interconnection cable and power supply as follows f 50 Hz 220 240 V a b c d e a Interconnection cable b Power supply cable c Circuit breaker d Residual current device e P...

Page 13: ...run is finished set the temperature to a normal level In cooling mode 26 28 C in heating mode 20 24 C 3 The system stops operating 3 minutes after the unit is turned OFF INFORMATION Even if the unit is turned OFF it consumes electricity When the power turns back on after a power break the previously selected mode will be resumed 9 4 Starting up the outdoor unit See the indoor unit installation man...

Page 14: ...ctor D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground H Harness H P LED V L Pilot lamp light emitting diode Symbol Meaning HAP Light emitting diode service monitor green HIGH VOLTAGE High voltage IES Intelligent eye sensor IPM Intelligent power module K R KCR KFR KHuR K M Magnetic relay L Live L Coil L R Re...

Page 15: ...tallation manual 15 ARXF20 42E5V1B R32 split series 3P650253 12H 2022 10 Symbol Meaning X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferrite core ZF Z F Noise filter ...

Page 16: ...T 9 5CuT M 6 4CuT 6 4CuT 4 8CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT Propeller fan 9 5CuT 9 5CuT 7 0CuT g2 g1 f f c a b d j l k g3 i e RXF20E RXF25E RXF35E ARXF20E ARXF25E ARXF35E h 7 0CuT 7 0CuT 9 5CuT M 4 8CuT 4 8CuT 6 4CuT 6 4CuT 4 8CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT 9 5CuT 9 5CuT e f c a b g2 f h g1 d j l k g3 i RXF42E ARXF42E ...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...TANBUL TÜRKİYE Tel 0216 453 27 00 Faks 0216 671 06 00 Çağrı Merkezi 444 999 0 Web www daikin com tr Gülsuyu Mahallesi Fevzi Çakmak Caddesi Burçak Sokak No 20 34848 Maltepe 3P650253 12H 2022 10 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...

Reviews: