3
|
Components
Service manual
279
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
a
b
a
Pump speed
b
PWM signal (duty cycle) [%]
Is the measured PWM signal correct?
Action
Yes
Replace the water pump housing, see
279].
No
Continue with the next step.
15
Unplug the water pump connector X25A and measure the PWM signal
between pins 1‑2 on the hydro PCB. The measured signal MUST be as
mentioned in the previous step.
Is the measured PWM signal correct?
Action
Yes
Replace the PWM signal harness
between the water pump and the hydro
PCB, see
279].
No
Perform a check of the hydro PCB, see
160].
3.24.2 Repair procedures
To remove impurities from the water pump housing
Prerequisite:
Remove the water pump housing, see
279].
1
Remove any impurities or objects that may block the water pump.
2
Install the water pump housing, see
279].
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
To remove the water pump motor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Disconnect the connectors from the water pump motor.
Summary of Contents for ALTHERMA
Page 357: ...11 11 ...
Page 358: ......
Page 359: ......
Page 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...