3 About the box
Installer reference guide
7
ERLQ004~008CA + 08S18CB
Daikin Altherma – Low temperature split
4P401676-1D – 2018.07
Chapter
Description
Commissioning
What to do and know to commission the
system after it is configured
Hand‑over to the user
What to give and explain to the user
Maintenance and service
How to maintain and service the units
Troubleshooting
What to do in case of problems
Disposal
How to dispose of the system
Technical data
Specifications of the system
Glossary
Definition of terms
Field settings table
Table to be filled in by the installer, and
kept for future reference
Note:
There is also an installer settings
table in the user reference guide. This
table has to be filled in by the installer
and handed over to the user.
3
About the box
3.1
Overview: About the box
This chapter describes what you have to do after the boxes with the
outdoor and indoor unit are delivered on-site.
It contains information about:
▪ Unpacking and handling the units
▪ Removing the accessories from the units
Keep the following in mind:
▪ At delivery, the unit MUST be checked for damage. Any damage
MUST be reported immediately to the carrier's claims agent.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ Prepare the path along which you want to bring the unit inside in
advance.
3.2
Outdoor unit
3.2.1
To unpack the outdoor unit
1
2
3.2.2
To remove the accessories from the
outdoor unit
1
Lift the outdoor unit.
CAUTION
Only handle the outdoor unit as follows:
57kg
2
Remove the accessories at the bottom of the package.
a
d
b
c
1×
1×
1×
2×
a
Outdoor unit installation manual
b
Fluorinated greenhouse gases label
c
Multilingual fluorinated greenhouse gases label
d
Unit mounting plate