7
|
Unit installation
Installer reference guide
65
EPRA08~W1 + ETBH/9W
Daikin Altherma 3 H MT W
4P634885-1 – 2021.03
7 Unit installation
In this chapter
7.1 Preparing the installation site
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
7.1.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the precautions and requirements in the
Mind the spacing guidelines. See
"16.1 Service space: Outdoor unit"
266].
NOTICE
▪
Do NOT stack the units on each other.
▪
Do NOT hang the unit on a ceiling.
Strong winds (≥18 km/h) blowing against the outdoor unit’s air outlet causes short
circuit (suction of discharge air). This may result in:
Summary of Contents for Altherma 3 H MT W
Page 294: ...13 13...
Page 295: ......
Page 296: ...4P634885 1 2021 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...