6 Electrical installation
Installation manual
16
ETBH/9W
Daikin Altherma 3 H HT W
4P644727-1 – 2021.02
7 9
YC
Y1
X2M
1
2
3
A4P
1+2
Wires connected to the alarm
output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
B
C
A
A
7
Y1
C
B
X2M
X2M
A4P
A4P
a
7 9
Y1
YC
X1M
a
Installation of EKRP1HBAA is required.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.7
To connect the space cooling/heating ON/
OFF output
INFORMATION
Cooling is only applicable in case of:
▪ Reversible models
▪ Heating only conversion kit (EKHBCONV*)
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
—
1
Open the following (see
"4.2.1 To open the indoor unit"
5]):
1
Front panel
1
2
3
2
Switch box cover
3
Switch box
2
Connect the space cooling/heating ON/OFF output cable to the
appropriate terminals as shown in the illustration below.
7 9
YC
Y2
X2M
1
2
3
A4P
1+2
Wires connected to the space
cooling/heating ON/OFF
output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
B
C
A
A
7
Y2
B
X2M
C
X2M
A4P
X1M
a
7 9
Y2
YC
A4P
a
Installation of EKRP1HBAA is required.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.8
To connect the changeover to external
heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
Open the following (see
"4.2.1 To open the indoor unit"
5]):
1
Front panel
1
2
3
2
Switch box cover
3
Switch box
2
Connect the changeover to external heat source cable to the
appropriate terminals as shown in the illustration below.