![background image](http://html.mh-extra.com/html/daikin/3amx52e4v1b/3amx52e4v1b_service-manual_501104013.webp)
Si121291EC
PCBs
Removal Procedure
11
7
Remove the main PCB.
In working, be careful not to
break the main PCB.
The main PCB and the
radiation fin are adhered to
one another.
8
Remove the 2 screws
and remove the
radiation fin.
When reassembling, make
sure to use the silicon
grease.
9
Remove the 3 screws
and remove the reactor.
Step
Procedure
Points
(R5549)
Clamp for reactor harness
(R11207)
(R5553)
Radiation fin
Reactor
(R11208)