![Daikin 2MXS52E2V1B Installation Manual Download Page 13](http://html1.mh-extra.com/html/daikin/2mxs52e2v1b/2mxs52e2v1b_installation-manual_3564757013.webp)
11
■
English
Pump Down Operation
In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve lid from liquid shut-off valve and gas shut-
off valve.
2) Carry out forced cooling operation.
3) After five to ten minutes, close the liquid shut-off valve with a
hexagonal wrench.
4) After two to three minutes, close the gas shut-off valve and
stop forced cooling operation.
1.
Forced operation
1) Turn the Operation Mode switch (SW2) to “COOL”. (Heat pump only)
2) Press the Forced Operation switch (SW1) to begin forced cooling. Press the Forced Operation switch (SW1) again to stop
forced cooling.
Gas shut-off valve
Close
Hexagonal
wrench
Liquid shut-off
valve
Valve lid
Service PC-board
Operation Mode
switch (SW2)
Forced Operation
switch (SW1)
01_EN_3P164392-2E.fm Page 11 Wednesday, May 24, 2006 2:47 PM
Summary of Contents for 2MXS52E2V1B
Page 19: ... 0606 HT 3P164392 2E M05B110A ...