![Dahua VTO7521G Quick Start Manual Download Page 12](http://html1.mh-extra.com/html/dahua/vto7521g/vto7521g_quick-start-manual_500228012.webp)
Installation 7
Apply silica gel to gaps
Figure 4-3
4.2.2 Installing in the Wall
Installing in the wall
Figure 4-4
Table 4-2 Item list
No. Item
No. Item
No. Item
1
VTO
2
Locking screw
3
Cable entry
4
Mounting box
5
Wall
–
–
Cut an opening with the size of the mounting box on the wall, and then put the
Step 1
mounting box in.
Apply sealant to gaps between the mounting box and wall.
Step 2