
15
9. To remove H.V.transformer.
1) Remove four screws holding the H.V.transformer.
2) Remove the H.V.transformer.
3) Reverse the above steps for reassembly.
8. To remove wind guide assembly.
1) Remove a screw which secure the wind guide assembly.
2) Draw forward the wind guide assembly.
3) Pull the fan from the motor shaft.
4) Remove two screws which secure the motor shaded pole.
5) Remove the motor shaded pole.
6) Reverse the above steps for reassembly.
Summary of Contents for KOG-8B5R5S
Page 5: ...4 EXTERNAL VIEW 1 OUTER DIMENSION 465 287 376...
Page 27: ...26 WIRING DIAGRAM...
Page 29: ...28 Measure Point...
Page 30: ...29 Measure Point...
Page 32: ...2 PCB CIRCUIT DIAGRAM 31...