MEASUREMENT AND TEST
2. ELECTRICAL CONTINUITY CHECK OF INTERLOCK SWITCH
PROCEDURE
1. Primary interlock switch
(1) Disconnect two connectors from primary interlock switch.
(2) Connect the ohm-meter leads between the terminals of the primary interlock switch.
2. Read the value of resistance between the terminals of the switch, when the door is opened, and when the door is closed.
3. Secondary interlock switch
(1) Disconnect two connectors from secondary interlock switch.
(2) Connect the ohm-meter leads between the terminals of the secondary interlock switch.
(3) Read the value of resistance between the terminals of the switch, when the door is opened,
and when the door is closed.
3. Monitor interlock switch
(1) Disconnect the lead wire connecting the primary interlock switch and interlock monitor switch from
primary interlock switch terminal.
(2) Connect the ohm-meter leads between the lead wire connector disconnected as item1 and
the power supply neutral plug pin.
(3) Read the value of resistance between the lead wire connector and the power supply neutral plug pin,
when the oven door is opened, and when the oven door is closed.
JUDGEMENT
•
The value of resistance should be applied to the value specified below.
•
When value obtained is not acceptable, the switch should be replaced or adjusted again.
Switch
Door Open
Door Close
Prim ary interlock sw itch
0
Secondary interlock sw itch
0
Interlock m onitor circuit
0
R em ove the pow er plug from the w all receptacle before testing.
NOTE
Summary of Contents for KOC-970T1S
Page 30: ... WIRING DIAGRAM ...
Page 31: ... SCHEMATIC DIAGRAM ...
Page 32: ... SCHEMATIC DIAGRAM ...
Page 33: ... SCHEMATIC DIAGRAM ...
Page 34: ... EXPLODED VIEWS AND PARTS LIST 1 KOC 970T EXPLODED VIEW ...
Page 37: ... EXPLODED VIEWS AND PARTS LIST 2 KOC 980T EXPLODED VIEW ...