22
4.
MECHANICAL ADJUSTMENT
4-1. MECHANICAL ADJUSTMENT
(See Fig.4-1~4-5)
When operational problems occur or the mechanism is reassembled, be sure to confirm the following
INSTRUCTIONS.
a. Make sure that the DATUM HOLE of the CAM GEAR is aligned with the DATUM HOLE in the
MAINBASE in the EJECT mode, as shown in Fig.4-1.
b. Make sure that part "A" of the RELAY LEVER, when assembled in the CONNECT PLATE, is fully rotated
to the left side of "B" of the MAINBASE, and is touching boss "C" of the MAINBASE as, shown in
Fig.4-2.
CAM GEAR
F/L RACK
DATUM HOLE OF CAM GEAR
DATUM HOLE OF MAIN BASE
Summary of Contents for K50
Page 4: ...3 1 2 1 WIRE DIAGRAM 1 2WIREDIAGRAM...
Page 8: ...7 2 1 2 PARTS LOCATION OF FRONT LOADING ASS Y A TOP VIEW B FRONT VIEW...
Page 38: ...37 6 EXPLODED VIEW AND PARTS LIST 6 1 EXPLODED VIEW OF DECK ASS Y TOP VIEW...
Page 39: ...38 6 2 EXPLODEDVIEWOFDECKASS Y BOTTOMVIEW...
Page 40: ...39 6 3 EXPLODEDVIEWOFF LASS Y...
Page 41: ...40 D0040 D0020 D0050 D0010 D0080 D0090 D0060 D0070 D0040...