24
rum Wa
2-2. Drainage
1) Pump Operation - Washing cycl
FUNCIONAMIENTO DE LA BOMBA CICLO DE LAVADO
%
Before Drainage Completion: Pump continuously on
ANTES DE TERMINAR EL DRENADO LA BOMBA CONTINUA
&
Spin-drying Cycle after Drainage Completion
SPIN-CLICO DE SECADO TERMINACION DEL DRENADO
: On for 18sec and off for 3sec
POR PERIODOS DE 18 SEG TRABAJANDO Y 3 SEC EN REPOSO
2-3. Sensor Detection
SENSOR DE DETECCION
1) Water Level Sensor
SENSOR DE NIVEL DE AGUA
*
Water Level Data
DATOS SOBRE EL NIVEL DE AGUA
Classification
ALTURA
Frequency
Remarks
Water Level
(mm)
(KHz)
Especificacion-minima
130
24.62
Spec.
baja
130 24.62
Lavado-Minimo
130 24.38
Washing Low
130
24.09
Standard Rinsing
160
24.27
Rinsing
160
23.64
Additional Rinsing
175
24.01
Tub Washing
195
23.77
Overflow
260
22.6
Safety
125
24.7
Reset
125
24.68
Summary of Contents for DWD-WD135 SERIES
Page 48: ...47 PCB PIN ARRANGEMENT ...
Page 60: ...59 BLDC Motor Power Transmission System of BLDC Motor ...
Page 65: ...64 Wiring Diagram ...
Page 71: ...70 PLATE TOP ASS Y 1 Remove 3 screws 2 Remove 4 screws ...
Page 73: ...72 VALVE 3WAY 1 Remove 4 screws 2 Separate 3 connectors 3 Separate 3 hose clamps ...