20
3. DISASSEMBLY AND REPLACEMENT
3.1
REMOVAL OF THE FRONT LOADING
ASSÕY (FIG. 3.1)
a. Unscrew the 2 screw holding the F/L.
b. Separate the F/L ASS‘Y from the MAIN BASE settling down
point by lifting the rear part of F/L(Screw hole).
3.2 DISASSEMBLY OF FRONT LOADING
ASSÕY(FIG. 3.2~3.5)
a. Remove the one WASHER for holding the door opener and
separtate F/L Assembly by moving the DOOR OPENER in the
direction of arrow.
b. Remove the 2 screw holding the TOP PLATE and separate the
CASSETT HOLDER ASS‘Y by moving the
FL BRKT L and FL BRKT R in the direction of arrow (Fig. 3.2)
NOTE:
REMOVE THE FRONT LOADING ASS‘Y IN EJECT MODE
Fig. 3.1 Diassembly of the FRONT LOADING ASS‘Y
Fig. 3.2 Diassembly of the FRONT LOADING ASS‘Y
All manuals and user guides at all-guides.com
Summary of Contents for DR-C912B
Page 13: ...11 INSTRUMENT DISASSEMBLY All manuals and user guides at all guides com...
Page 39: ...37 EXPLODED VIEW 6 3 EXPLODED VIEW OF FL ASS Y All manuals and user guides at all guides com...
Page 44: ...42 WAVEFORMS VIDEO WAVEFORMS 480 4 6 20 34 All manuals and user guides at all guides com...
Page 114: ...NORMAL AUDIO BLOCK DIAGRAM 112 BLOCK DIAGRAM All manuals and user guides at all guides com...
Page 117: ...AMP BLOCK DIAGRAM 115 BLOCK DIAGRAM All manuals and user guides at all guides com...