background image

Frame and Foundation Assembly

2 – End Bar 3/8” x 13/8” x 61/4”

1 – Top Bar 3/4” x 11/16” x 19”

1 – Bottom Bar 3/8” x 11/16” x 1711/16”

1 - Plasticell Foundation

8 – 11/4” Nails

1. Nail the side rails to the Bottom Boards using 

the 21/4” nails.

2. Nail the Top Cleat to the top of the Bottom 

Board using the 11/4” nails.

3. Nail the Bottom Cleat to the bottom of the 

Bottom Board using the 3/4” nails.

(See figure 5 for assembling Bottom Board.)

Bottom Board

1 – Top Cleat 3/4” x 3/4” x 1411/16”

1 – Bottom Cleat 3/8” x 3/4” x 1411/16”

2 – Side Rails 3/4” x 115/16” x 22”

1 – Bottom Boards 3/4” x 153/16” x 22”

4 – 11/4” Nails

16 – 21/4” Nails

4 – 3/4” Nails

End Bar

3/8” x 13/8” x 61/4”

Top Bar

3/4” x 11/16” x 19”

Top Bar

3/4” x 11/16” x 19”

End Bar

3/8” x 13/8” x 61/4”

Top Cleat

Figure 4

Figure 5

Bottom Cleat

Side Rail

Side Rail

Bottom Boards

Foundation sold 

separately

1. Assemble Frame using two 11/4” nails in 

each corner.

2. Insert Plasticell Foundation into slot in 

Bottom Bar.

3. Slightly bend Plasticell as you slide it 

into the GTB

.

Use two 11/4” nails 

in each corner

Assemble Smoker to Bellows 

using the four nuts provided. 

(See figure 6.)

Smoker & Bellows

Hive Tool

Figure 6

Reviews: