18
fig. a
fig. b
fig. c
Maintenance of O-Ring
Change:
Insert a screwdriver of 1.2mm in the channel of the O-ring, moving it outwards - fig. (a) and (b).
In order to fasten the new ring, execute the opposite process without the screwdriver (fig. c).
INSPECTION AND MAINTENANCE