
4.2
Unpacking
Unpack the instrument and check the items against the supplied packing list.
Check the equipment for damage before starting assembly and installation as follows.
•
Check that there are no loose parts in the transport crate.
•
Check that all the parts are either mounted on the system or located in the acces-
sory kit box.
If any damage is found, document the damage, and contact your local Cytiva represen-
tative.
It is recommended that all packing materials should be retained if onward transport of
the instrument is expected.
4 Installation
4.2 Unpacking
26
Monitor UVis-920 Operating Instructions 29055049 AF
Summary of Contents for Monitor UVis-920
Page 2: ...Pageintentionallyleftblank ...
Page 93: ...Pageintentionallyleftblank ...