Half Rack / Half Rack Combo
1. Install screws, washers, and locknuts securing the forged strength feet to the base assemblies.
Item
Description
Qty.
1
Forged Strength Foot
8
2
3” x 6” Rubber Slipper
8
3
3/4"- 10 Hammer Lock Nut
12
4
1/2”-13 Lock Nut
8
5
1/2” Flat Washer
8
6
1/2-13 x 1-1/4” Hex Head
Screw
8
Tighten hardware to 20-25 ft-lb
(27-34 Nm).
2. Install rubber slippers onto the forged strength feet.
3. Install screws and washers securing the upright assemblies to the base assemblies.
Item
Description
Qty.
1
3/4-10 x 1-1/4” Hex Head
Screw
4
2
3/4” Flat Washer
4
Hand tighten hardware.
4. Install screws, washers, spacers, and locknuts securing the cross member assembly to the upright and base assemblies.
Page 17 of 44
Summary of Contents for Structure ST-FSS
Page 2: ......
Page 44: ...Foot Dimensions Use below image to determine foot height thickness Page 42 of 44...
Page 45: ......