![CYBEX PP-ACO Assembly Manual Download Page 26](http://html1.mh-extra.com/html/cybex/pp-aco/pp-aco_assembly-manual_2703597026.webp)
Install Storage Station
The following procedure shows how to install the Storage Station (SC) to the CORE.
Tools Required:
• 7 mm Allen wrench (x2)
• 17 mm Open end wrench
• Torque wrench
Note:
All screws must be torqued to 25-30 FT-LBS. (27.1-33.9Nm).
1.
Qty
Description
3
Screw, M10 x 1.5, 25 mm
1
3
Washer
2
3
Nut, hex nylock
3
1
Top mount
4
1
Core
5
2.
Qty
Description
2
Screw, M10 x 1.5, 65 mm
1
2
Nut, hex nylock
2
2
Washer
3
1
Hanger
4
3.
Qty
Description
4
Screw, M10 x 1.5, 80 mm
1
4
Washer
2
4
Nut, M10 x 1.5 socket head
3
1
Bracket
4
1
Storage station
5
Page 26 of 54
Summary of Contents for PP-ACO
Page 2: ......
Page 35: ...Free Standing Cable Crossover PP ACOFS Page 35 of 54...
Page 36: ...Dip Chin Assist PP ADC Page 36 of 54...
Page 37: ...Dual Lat Pull PP LPD Page 37 of 54...
Page 38: ...Dual Pulley High PP DPH Page 38 of 54...
Page 39: ...Dual Pulley Low PP DPL Page 39 of 54...
Page 40: ...Dual Row PP RWD Page 40 of 54...
Page 42: ...Lat Pull PP LP Page 42 of 54...
Page 43: ...Row PP RW Page 43 of 54...