Assembly and Set Up
Page 2-1
Cybex Arc Trainer 750A/750AT Owner’s Manual
2 – Assembly and Set Up
Warning and Caution
Read and understand all warnings and cautions listed in Chapter 1 – Safety before assembling unit.
Use extreme caution when assembling the unit. Failure to do so could result in injury or death.
WARNING: Always use proper lifting methods when moving heavy items.
Ensure all electrical requirements are met as indicated in the specifi cations in Chapter 1 – Safety and as
listed in this chapter.
Choosing and Preparing Site
Before assembling the unit, verify chosen site meets the following criteria:
Area is well lit and well ventilated.
Surface is structurally sound and properly leveled.
NOTE: Place a 3/4” (1.9 cm) thick wood base under
unit to protect carpeting.
Area allows for ample access and passage clearance around unit or for emergency dismount. Minimum
clearance is 19.7 inches (.5 meters) on at least one side of unit and also behind unit.
NOTE: The access and passage clearance dimensions stated are the recommended minimum dimensions
as set forth by the manufacturer. The actual area for access and passage is the responsibility of the
facility and should take into account any required local codes or regulations.
Area is not in vicinity of high humidity, such as in the vicinity of a steam room, sauna, indoor pool or
outdoors. This unit is designed to function normally in an environment with a relative humidity range of
30% to 75%
.
NOTE: Exposure to extensive water vapor, chlorine and/or bromine could adversely affect the electronics as
well as other parts of the unit.
Area maintains an ambient temperature range of 50° F (10° C) to 104° (40° C).
Electrical Power Requirements
NOTE: The AC power kit is optional.
Verify unit is connected to an outlet having the same con
fi
guration as the plug.
Verify connection is a grounded circuit.
NOTE: Do not use a ground-plug adapter to adapt the 3-prong power
cord to a non-grounded electrical outlet.
NOTE: Use Cybex supplied optional AC power kit only. Consult an electrician with any questions.
Verify power supply is compliant with local building codes
.
Summary of Contents for 750A
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 34: ...Assembly and Set Up Page 2 18 Cybex Arc Trainer 750A 750AT Owner s Manual ...
Page 56: ...Cybex 750A 750AT Owner s Manual ...
Page 76: ...Cybex 750A 750AT Arc Trainer Owner s Manual Parts List Page C 2 ...
Page 98: ......
Page 99: ......