Chapter 4
:
Replacing Components and Preventive Maintenance
64
SE505 Hardware Manual
Maintenance Schedule
Perform the maintenance procedures in this section as specified in the maintenance schedule
below. Perform maintenance more frequently as required, based on machine usage.
Table 10.
Maintenance Schedule
Warning:
To prevent the risk of injury, turn the AC main circuit breaker to OFF to shut down all
electrical power to the SE505 before starting any replacement operations. For more information,
refer to the section “
Maintenance
Monthly
Annually
Page
Every 3 months
Every 3 months
Clean the Main Electrical Panel
Every 3 months
Clean the Air Regulator Filters
Every 3 months
Every 3 months
Every 3 months
Every 3 months
Lubricate the Gantry and Z-Stage
Every 3 months
Replacing the Conveyor Edge Strip Guides
Once a year
Once a year
Every 3 years
Every 3 months
Once a month
Frequency
Summary of Contents for SE505
Page 1: ...SE505 Hardware Manual ...
Page 6: ...Contents vi SE505 Hardware Manual ...
Page 10: ...x SE505 Hardware Manual ...
Page 72: ...Chapter 3 Installation 62 SE505 Hardware Manual ...
Page 168: ...Chapter 4 Replacing Components and Preventive Maintenance 158 SE505 Hardware Manual ...
Page 180: ...Index 170 SE505 Hardware Manual ...