![CWSI CP-3000 Operating And Installation Instruction Manual Download Page 15](http://html.mh-extra.com/html/cwsi/cp-3000/cp-3000_operating-and-installation-instruction-manual_2701246015.webp)
15
features and options. Prior to the installation and testing of the initiating devices, the control panel can
be left in normal mode for real time operation testing of the system or placed in one of the available
test modes. Refer to system testing for these options then begin installing the initiating devices
starting with the ones located closest to the control panel. Hold the first device at its desired position
and generate a signal survey transmission from it (refer to the individual device manual for signal
survey transmission). If the signal is acceptable the device may be installed at that location. Slight
transmitter location adjustments may or may not have to be made in order to obtain acceptable signal
strength results. Do not mount any device unless acceptable signal strength indicating tone is heard
(two beeps). Once the device is mounted confirm acceptable signal strength once more to insure
proper operation. After the device has been installed and signal verified, activate the device for an
alarm signal transmission and verify proper alarm reception and proper site specific programming
function operations. See the individual manuals for alarm activation methods of each device.
Continue installing the balance of the equipment following this method and the installation will be a
successful one with few if any problems. After all of the equipment has been installed and powered
up be sure to place the panel in normal monitoring mode. Installation trouble with any devices will be
reported with in 200 seconds. Refer to the operation section of this manual for further information.
figure 5