- 19 -
ur 0
No hot water-0, hot water priority-1, no hot water priority-2,
mixing pump-3
L 40
Minimum boiler temperature
H 90
Maximum boiler temperature
h 5
Boiler temperature hysteresis
A 99
Boiler overheating temperature
Fd60
Fuel shortage testing time with burning, increase by 5˚C
Fb30
Fuel shortage testing time in WORK mode and burning
out.
Ar 0
Additional output: 0-FUEL, 1-ALARM, 2-MIX
6)
System
6.1) Standards
•
Heating System – during installation and operation of the boiler it is very
important to keep safe distance from the inflammable materials. The boiler is
allowed to work only in open type heating systems!
•
Electrical installation – the boiler’s power supply is 230V/50Hz
•
Chimney – It must be done with respect to current norms and regulations.
Due boiler gasses temperature 90-100 C it is obligatory to put the INOX or
other material tubes into the chimney. Required chimney draught is 0,1 –
0,2 mbar. Installation according to ADJ does entail some testing of the
chimney, which may be carried out by
a sweep
•
Important sources of guidance installers: 98/37/EEG; 89/336/EEG;
73/23/EEG; EN 55014-1, 1993 /A1, 1997; EN 55014-1; EN 55014-2 C1
1998; EN 61000-3-2; EN 61000-4-2, -3-4-5-6-11, Level2; EN 50165; EN
50165 C1; EN 60335-1; EN 303-5; EN 12809; EN 13394
6.2) Localization of the boiler:
•
Placing on flammable foundation.
•
place the boiler on non-flammable and thermal insulating pad which should protrude
not less than 20 mm outside boiler’s dimensions;
•
If the boiler is located in the basement it is required to place it on a base raised not
lower than 50 mm over floor’s level. The boiler and the fuel hopper must stand
vertically and can be leveled using the regulating screw in fuel hopper’s leg.
•
1 000 mm of free space must be left in front of the boiler.
•
Minimal distance between back wall of the boiler and boiler room’s wall is 400 mm.
•
Minimum distance between free side of the boiler and boiler room’s wall is 100 mm.
•
The (230V/50Hz) electric socket should be easy to access.