1. INSTALLATION AND OPERATION
SMICE-PS
2
1-
1.1.2 Connectors for Drawers 1 and 2
The impulse specified by the ESC P command is in output at these connec-
tors. The host can confirm the status of input signals through the DLE EOT,
ESC u, GS r commands.
The functions assigned to the pins in the connector are as follows:
N
I
P N
I
P N
I
P N
I
P N
I
P
L
A
N
G
I
S
L
A
N
G
I
S
L
A
N
G
I
S
L
A
N
G
I
S
L
A
N
G
I
S
T
U
O
/
N
I
T
U
O
/
N
I
T
U
O
/
N
I
T
U
O
/
N
I
T
U
O
/
N
I
1
1
1
1
1
D
N
G
2
2
2
2
2
L
A
N
G
I
S
1
E
V
I
R
D
T
U
O
-
K
C
I
K
L
L
I
T
T
U
O
3
3
3
3
3
L
A
N
G
I
S
E
S
O
L
C
/
N
E
P
O
L
L
I
T
N
I
4
4
4
4
4
V
4
2
+
5
5
5
5
5
L
A
N
G
I
S
2
E
V
I
R
D
T
U
O
-
K
C
I
K
L
L
I
T
T
U
O
6
6
6
6
6
D
N
G
The solenoid must be connected between connector pins 2 or 5 and 4.
WARNING:
To avoid current overload, the resistance of the drawer kick-out
solenoid must be
≥
24
Ω
.
Drawer kick-out drive signal
Current: 1A (max 10 sec.) or less
Output waveform: t1 (ON time) and t2 (OFF time) are specified by ESC P.
In ON time phase (t1), output voltage is approx. 0V.
In OFF time phase (t2), the output signal is at high impedance.
Solenoid 1
Solenoid 2
(Fig.1.2)
Output
waveform
(Tab.1.2)