5/16 x 1-5/8
Chain link
Turnbuckle
351243
1/4-20 x 3/4
5/16 split washer
5/16 hex nut
e
n
1
/4
-2
0
h
x
u
t
a
s
1
/4
-2
0
lo
c
k
w
h
e
r
Make a sufficient number of wraps,
then wrap with electricians tape.
Tape one end of the cable to the
chain link with electricians tape.
8
26
3
7
1
3
5
8
7
3
1
378208
Place the clamp next to the
boom section bolt. This will
prevent it from moving.
358731
351244
Chain link
351244
Placement on the other side of the
1/4-20 bolt will prevent movement
Install the boom support cable as shown. You will need to cut the cable to the correct length.
30 feet has been supplied. Cut this length in half and use one for each side. To adjust tension
on the cables, slide the mount up and down to level the boom. Use the turnbuckles for fine
adjustment after the clamp has been secured. Make sure after your done adjusting to route
the wire as shown in the above diagram. Looping the wire through the turnbuckle will prevent
it from turning and releasing tension on the wire. You should have more support wire than needed.
The excess will depend on how high you mount the support bracket above the antenna.
Slide mount up and down to adjust
tension. Use the turnbuckle for fine
adjustment.
About 3ft