background image

22XB

13

050013

PLASTIC

1-1/4"

2

CAP

(3.2 cm)

41

011941

SS LOCK

#8

2

WASHER

120

010123

SS

8-32 x 2"

2

SCREW

(5.1 cm)

232

010232

SS

8-32 x 2-1/2"

2

SCREW

(6.4 cm)

412

030412

SS WORM

1-1/2"

4

CLAMP

(3.8 cm)

2

BA

ALUM TUBE

1-1/4" x 48"

1

(8 holes)

(3.2 x 121.9 cm)

BB

ALUM TUBE

1-1/2" x 72"

1

(8 holes)

(3.8 x 182.9 cm)

BC

ALUM

1-3/8" x 12"

1

TUBING

(3.5 x 30.5 cm)

BD

ALUM TUBE

1-1/2" x 72"

1

(6 holes)

(3.8 x 182.9 cm)

BE

ALUM TUBE

1-1/4" x 48"

1

(4 holes)

(3.2 121.9 cm)

11

010011

SS HEX

8-32

4

NUT

KEY

P/N

DESC.

SIZE

QTY

 

 KEY           P/N             DESCRIPTION                                                              QTY

MASTER PARTS LIST

404

010404

2-1/2" x 3" (5.5 x 7.6 cm) stainless steel U-bolt

2

412

030412

1-1/2" (3.8 cm) stainless steel worm clamp

4

BA

1-1/4" x 48" (3.2 x 121.9 cm) aluminum tube, 8 holes

1

BB

1-1/2" x 72" (3.8 x 182.9 cm) aluminum tube, 8 holes

1

slotted both ends

BC

1-3/8" x 12" (3.5 x 30.5 cm) aluminum tube, 2 holes

1

BD

1-1/2" x 72" (3.8 x 182.9 cm) aluminum tube, 6 holes

1

slotted both ends

BE

1-1/4" x 48" (3.2 x 121.9 cm) aluminum tube, 4 holes

1

BN

29" (73.7 cm) Coaxial balun

2

DC

Connector bracket assembly

2

EA

40" (101.6 cm) aluminum rod

2

EB

1/2" x 39-1/2" (1.3 x 100.3 cm) aluminum tube

2

EC

37-1/4" (94.6 cm) aluminum rod

2

ED

36-3/4" (93.3 cm) aluminum rod

2

EE

36-3/8" (92.4 cm) aluminum rod

2

EF

35-7/8" (91.1 cm) aluminum rod

2

EG

35-1/4" (89.5 cm) aluminum rod

4

EH

35" (88.9 cm) aluminum rod

2

EI

34-3/4" (88.3 cm) aluminum rod

4

ET

3/8" x 10" (1 x 25.4 cm) T-match tube

4

FL

Phase harness assembly with T-connector

1

PS2

Polarity switcher assembly

1

  

KEY           P/N             DESCRIPTION                                                              QTY

11

010011

8-32 stainless steel hex nut

38

13

050013

1-1/14" (3.2 cm) black plastic cap

2

26

190026

7/8" (2.2 cm) formed aluminum bracket

22

28

190028

Aluminum half washer

20

41

011941

No. 8 split lock washer

38

53

050053

1/2" (1.27 cm) black plastic cap

4

70

190070

4" x 6" (10.2 x 15.2 cm) formed mounting plate

1

79

010079

8-32 x 1/2" (1.3 cm) stainless steel machine screw

8

84

010084

1/4" (.64 cm) stainless steel lock washer

4

85

010085

1/4" (.64 cm) stainess steel hex nut

4

104

010104

1/4" (.64 cm) stainless steel flat washer

4

109

353109

Phono plug male

1

115

050115

Vinyl Boot

1

116

240116

Silicone Package

3

118

010118

5/16" (.79 cm) stainless steel hex nut

4

119

010119

5/16" (.79 cm) stainless steel lock washer

4

120

010120

8-32 x 2" (5.1 cm) stainless steel machine screw

10

124

190124

Connector strap 1" (2.5 cm)

1

125

200125

Tuning strap

4

232

010232

8-32 x 2-1/2" (6.4 cm) stainless steel machine screw

14

251

050251

3/8" (1 cm) white plastic cap

4

326

290326

Danger label

1

401

010401

1-1/2" x 3" (3.8 x 7.6 cm) stainless steel U-bolt

2

KEY

P/N

DESC.

SIZE

QTY

#1 - ASSEMBLE BOOM

Slide worm clamps (412) onto the non-swaged ends of tubes BB and BD (figure A).  Locate the short tube BC and insert end with hole closest it into tube
BD.  Align the hole through BC with the first hole in BD.  Temporarily pin tube BD to tube BC with screw (232) and nut (11). This screw will be removed
later to install the elements.  Slide tube BB over the free end of tube BC aligning holes and temporarily pinning in place with screw (232) and nut (11).
Slide both worm clamps (412) over slots in tube BB and BD and tighten.  Slide worm clamps (412) over the swaged ends of tubes BB and BD.  Referring
to figure A, insert the correct end of tube BA into tube BB until the first set of holes align.  Permanently install screw (120), washer (41) and nut (11).  Insert
the correct end of BE into tube BD until the first set of holes are aligned.  Permanently pin tubes together with screw (120) and nut (11).  Tighten clamps
(412).  Push the end caps (13) onto the boom ends.

FIGURE A

2-3/8"

(6.0 cm)

BB

BD

BC

4-13/16"

(12.2 cm)

14-1/2"

(36.8 cm)

3-3/4"

BA

8 holes

8 holes

6 holes

4 holes

1-3/16"

(3.0 cm)

BB

BD

11

41

232

232

11

41

120

11

41

120

11

41

13

13

412

412

412

412

412

412

412

3-3/4"

(9.5 cm)

FRONT

BA

BE

BE

20-1/8

(51.1 cm)

Summary of Contents for 22XB

Page 1: ...ASSEMBL Y AND INSTALLATION INSTRUCTIONS 22XB 2 METER OSCAR BOOMER C O R P O R A T I O N 951449 10 98 144 148 MHz ...

Page 2: ...duty antenna rotator will provide the best service and longest life Mount your 22XB as high as possible with the boom to mast plate mounted as shown in figure G The mast should be at a 45 degree angle to both element planes SYSTEM GROUNDING Direct grounding of the antenna mast and tower is very important This serves as protection from lightning strikes and static buildup and from high voltage whic...

Page 3: ...rmed mounting plate 1 79 010079 8 32 x 1 2 1 3 cm stainless steel machine screw 8 84 010084 1 4 64 cm stainless steel lock washer 4 85 010085 1 4 64 cm stainess steel hex nut 4 104 010104 1 4 64 cm stainless steel flat washer 4 109 353109 Phono plug male 1 115 050115 Vinyl Boot 1 116 240116 Silicone Package 3 118 010118 5 16 79 cm stainless steel hex nut 4 119 010119 5 16 79 cm stainless steel loc...

Page 4: ...or bracket should face thefrontoftheantenna ConnectT matchtubes ET todrivenelementusingstrap 125 andhardware Setthespacingbetweenthestrapsandbrackets Install coax balun BN across the T match figure B and weather proof with silicone as shown in figure B 2 Tighten hardware and press on endcaps 251 and 53 Assemble other driven element as illustrated in figure C Locate position of element from figure ...

Page 5: ...aneoftheantenna RefertofiguresDandEasguides in mounting elements Install the element EA using the hole closest to the rear The next hole along the boom is for a the driven element with the polarity switcher figure B Install the progressively shorter elements working towards the front of the boom Remove temporary pins as you proceed and replace with elements Use screw 120 on sections BA and BE Use ...

Page 6: ...INSTALL PHASE CABLE Route phase cable assembly FL to driven elements figure F Apply silicone 116 to outer threads of UHF connectors on both driven elements EB Do not coat center pins Thread on connectors and coat outer shell of connectors with remaining silicone Slide vinyl boots 115 over connectors until they butt up against connector brackets DC Attach two conductor wire to phono plug 109 Withou...

Page 7: ...ANGER 1 LABEL KEY P N DISPLAY DESC SIZE QTY 6 5 BOOM TO MAST AS SEMBLY Assemble and mount the boom to mast clamp 70 between elements 7and8withU bolts 401 asshowninfigureEandG Rotatemastclamp so that it makes a 45 degree angle between both sets of elements Secure with flat washers 104 lock washers 84 and nuts 85 in that order Note that the center of the mast must be 8 20 3 cm away from element 7 Ti...

Page 8: ...liable for any incidental or consequential damages which may result from a defect Some states do not allow limitations on how long an implied warranty lasts or exclusions or limitations of incidental or consequential damages so the above limitation and exclusion may not apply to you This warranty gives you specific legal rights and you may also have other rights which vary from state to state This...

Reviews: