background image

KEY FEATURES/SPECIFICATIONS/SYSTEM REQUIREMENTS

FS34

Key Features

•  External/Non-Immersed Temperature Sensor – Reduces mineral build-up.

• 

1VMTF#SFX5FDIOPMPHZo$IPJDFPGUISFFQVMTFCSFXPQUJPOTGPSPQUJNBMDPGGFFnBWPSBOECSFXJOHFYDFMMFODF

•  Brew Cycle Counter – Tracks brew cycles.

•  Programmable Temperature Control – Factory preset to 200°F. Temperature is easily adjusted in 2°F 

increments from 170°F to 206°F for optimum coffee quality. Keeps brew temperature constant. Easily handles 

CBDLUPCBDLCSFXJOHDZDMFT1MVTMJRVJEMFWFMDPOUSPMJOUFSGBDFQSFWFOUTFMFNFOUCVSOPVU

6SHFLÀFDWLRQV6HOHFWHG0RGHOV

(OHFWULFDO6XSSO\5HTXLUHPHQWV

02'(/

'(6&5,37,21

3+$6(

92/76

$036

+($7,1*&21),*

:,5(

:$776

+(57=

*$/+5

7/3

%ODFNWH[WXUHÀQLVK

1 PH

120 V

12.5 A

1 x 1450 W

2W + G

1500 W

50/60 Hz

4.5

7/3$

6WDLQOHVVVWHHOÀQLVK

1 PH

120 V

12.5 A

1 x 1450 W

2W + G

1500 W

50/60 Hz

4.5

7/3$

6WDLQOHVVVWHHOÀQLVKWDOO

1 PH

120 V

12.5 A

1 x 1450 W

2W + G

1500 W

50/60 Hz

4.5

'LPHQVLRQV

:DWHU6XSSO\5HTXLUHPHQWV

02'(/

+(,*+7

:,'7+

'(37+

6+,3:(,*+7

6+,3&8%(

:$7(5&211(&725

:$7(535(6685(

0,1)/2:5$7(

7/3

17.76”

10.65”

18.39”

OEV

3.92 cu ft

µÁDUH

SVL

1.0 gpm

7/3$

17.79”

10.65”

18.69”

OEV

3.92 cu ft

µÁDUH

SVL

1.0 gpm

7/3$

19.00”

10.65”

18.69”

OEV

3.92 cu ft

µÁDUH

SVL

1.0 gpm

TLP KEY FEATURES/SPECS/SYSTEM REQUIREMENTS  

122817A

Following are the factory default settings for the TLP brewer:

•  Brew Volume = 74oz./2.2L (Full brew)  

 

   

      37oz./1.1L (Half brew) 

•  Brew Temperature = 200°F

•  Pulse Brew = Off

Summary of Contents for TLP

Page 1: ...RZ 3UR OH LUSRW RIIHH UHZLQJ 6 VWHP 86 5 8 5 1 6 9 7 6 16758 7 216 127 72 167 5 Please leave this booklet with the machine 5 1 30 5 07 3 SFW 0RGHO 7 3 ZLWK 3RXU3RW VKRZQ...

Page 2: ...QGHG 3DUWV 7DQN VVHPEO IP63 OHFWULFDO 6FKHPDWLF ES67 7URXEOHVKRRWLQJ XLGH 7 UURU RGHV EC6 3URGXFW DUUDQW 3 Contact Information Wilbur Curtis Co Inc 6913 Acco Street Montebello CA 90640 US Phone 323 83...

Page 3: ...HOHFWHG 0RGHOV OHFWULFDO 6XSSO 5HTXLUHPHQWV 02 6 5 37 21 3 6 92 76 036 7 1 21 5 776 57 5 7 3 ODFN WH WXUH QLVK 1 PH 120 V 12 5 A 1 x 1450 W 2W G 1500 W 50 60 Hz 4 5 7 3 6WDLQOHVV VWHHO QLVK 1 PH 120 V...

Page 4: ...jury or void the warranty This appliance is designed for commercial use Any service other than cleaning and preventive maintenance should be performed by an authorized Wilbur Curtis service technician...

Page 5: ...Z QFSTPOT ZFBST BOE BCPWF XJUI SFEVDFE QIZTJDBM TFOTPSZ PS NFOUBM DBQBCJMJUJFT or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in...

Page 6: ...PECIFICATIONS section for the correct size The water line should also be capable of being DPOUSPMMFE CZ B TIVU PGG WBMWF P OPU DPOOFDU UIF XBUFS MJOF UP B TBEEMF WBMWF 4 OUFSOBUJPOBM SFRVJSFT UIF GPMM...

Page 7: ...o adjust brewer height Do not extend them higher than necessary WARNING Connect the power cord to the appropriate type and size electrical outlet If the electrical outlet is not compatible with the po...

Page 8: ...will come on 9 Perform a brew cycle of a least 12 ounces to purge any remaining air from the system See OPERATING INSTRUCTIONS During the initial brew cycle and XIFOFWFS UIF mMUFS JT SFQMBDFE ZPV NBZ...

Page 9: ...l it stops The brewer will brew coffee based on the settings programmed into the control panel To change the settings see the PROGRAMMING GUIDE section The brewer should be ON POmSN BU UIF SFBS UPHHMF...

Page 10: ...brush for hard to clean areas Rinse with clean water then dry 3 Wipe the spray head area with a cloth soaked in a mild detergent solution Rinse with a cloth soaked with clean water removing any resid...

Page 11: ...to air dry Cleaning Pour Pots Wash Wipe the exterior surfaces of the pour pot and lid with a sponge soaked with the detergent solution to remove spills and debris Fill the liner with the detergent sol...

Page 12: ...d the HALF BREW button Press and release the POWER button 3 Continue to hold down the HALF BREW button until the READY light TUBSUT UP nBTI then release the HALF BREW button 4 3FBE UIF FYJTUJOH UFNQFS...

Page 13: ...E TFU UIF CSFX WPMVNF Changing the Half Brew Volume Factory Default 37oz 1 1L 1 Turn the brewer on and wait for the BREW light to come on solid 2 Make sure the brew basket is empty and pushed all the...

Page 14: ...ON position The control panel must be off power light off Press the POWER button if necessary 2 Press and hold the HALF BREW button Press and release the POWER button 3 Continue to hold down the HALF...

Page 15: ...n 45 1cm 11 40i n 28 9cm 11 68i n 29 7cm 11 71i n 29 7cm 11 48i n 29 2cm 11 48i n 29 2cm 12 71i n 32 3cm 17 79i n 45 2cm 18 39i n 46 7cm 18 69i n 47 5cm 18 69i n 47 5cm 9 15i n 23 2cm 10 65i n 27 1cm...

Page 16: ...and Accessories All Models CAB 1 Cleaning Brush WC 29030 Spray Head 16 8 1 1A 1 1B 23 5 24 20 21 2 10 9 22 3A 3B 12A 12B 12C 6 15 13 19 Orientation varies based on manufacture da 17 14 TLP Series Main...

Page 17: ...RIP 7 8 O D 15 WC 1200 CORD 14 3 SJTO 6 BLK W PLUG 16 WC 13418 HARNESS ASSY CONTROL 120V TLP 17 WC 29044 101 SLEEVE OVERFLOW 18A WC 4213 a NUT 5 8 LOCK PLATED 18B WC 4212 02 b NUT 5 8 18 JAM PLASTIC 1...

Page 18: ...NG 1 45KW 120V W JAM NUTS SILICONE O RING 6 WC 1438 101 SENSOR TEMPERATURE TANK 7 WC 4394 GUARD SHOCK HEATING ELEMENT FOR SINGLE HEATING ELEMENT WC 62086 Recommended Parts to Stock ITEM PART DESCRIPTI...

Page 19: ...ELECTRICAL SCHEMATICS ES67 5 1 53 4 5 TLP TLP12A TLP12A19...

Page 20: ...IF UFSNJOBMT ZPV TIPVME IFBS UIF WBMWF DMJDL PQFO DMPTFE BU UIF NPNFOU QPXFS JT BQQMJFE PS SFNPWFE GSPN UIF UFSNJOBMT 5IF JOMFU WBMWF TIPVME PQFO BOZ UJNF UIF XBUFS UBOL JT OPU GVMM G UIF WBMWF EPFT O...

Page 21: ...FOTPS SFTJTUBODF JT BCPWF L XIFO UIF XBUFS JT DPPM SFQMBDF UIF DPOUSPM CPBSE G UIF 3 MJHIU JT not PO BOE UIF XBUFS EPFT OPU IFBU 4 IFDL GPS QPXFS BDSPTT UIF UFSNJOBMT PG UIF IFBUJOH FMFNFOU G QPXFS JT...

Page 22: ...OOFDUJPOT 4 G UIF XJSJOH UP UIF JOMFU WBMWF JT 0 CVU UIFSF JT OP QPXFS UP UIF JOMFU WBMWF SFNPWF UIF PSBOHF XJSF GSPN UIF XBUFS UBOL QSPCF G UIF XBUFS UBOL TUBSUT UP mMM SFQMBDF UIF XBUFS QSPCF G UIF...

Page 23: ...EPFT OPU DPNF PO XIFO UIF 3 8 CVUUPO JT QSFTTFE DIFDL UIF XJSJOH CFUXFFO UIF DPOUSPM CPBSE BOE UIF 414 NPEVMF DPOUSPM QBOFM G UIF 414 XJSJOH JT 0 FJUIFS UIF 414 NPEVMF PS UIF DPOUSPM CPBSE JT CBE LVS...

Page 24: ...se you of certain problems the brewer may experience expediting service or repair Error codes are indicated by the READY MJHIU PO UIF DPOUSPM QBOFM nBTIJOH POF PG UIF QBUUFSOT TIPXO CFMPX OZ CSFXFS TF...

Page 25: ...per installation of equipment This equipment must be installed by a professional technician and must comply with all local elec trical mechanical and plumbing codes Improper voltage Equipment must be...

Reviews: