Level the Water Tower
21 Center the water tower between the two brew heads
under the countertop. Refer to the hole pattern drawing
(Figure 3) for the proper location. Level it left to right and
front to back by turning the bottom of the legs.
Connect the Brew Head Water Return and Supply Lines
22 Link the brew heads to the water tower by attaching the
water return lines. These are the two larger diameter
nFYJCMFTJMJDPOFUVCFTUIBUDPNFGSPNCFIJOEUIFXBUFS
tower. The matching return lines from the spray head
BTTFNCMJFTXJMMIBWFBTUSBJHIUmUUJOHTMJQQFEJOUPUIFFOE
of the tube. Join the return line tubes together using this
mUUJOH.BLFTVSFUIFZBSFDPSSFDUMZPSJFOUFEBTTIPXOJO
Figures 12 and 13
.
23 Locate the two (2) 1/4 inch diameter water supply lines
behind the water tower. Shorten them to minimize length
when connected with the matching 1/4 inch tubing
coming from the bottom of the brew head assemblies.
24 Insert the water supply tubes from the back of the water
tower into the barbed connector on the supply line tube
mUUJOHTGSPNUIFCSFXIFBEBTTFNCMJFT4FF
Figure 12
.
SERA2, INSTALLATION INSTRUCTIONS
040220C
INSTALLATION INSTRUCTIONS
II12
WARNING:
The water return lines must not sag.
Route them in a downhill orientation between the
bottom of the brew head assemblies and the back of
the water tower (see
Figure 13
). The tubing can be
shortened if necessary to make sure that the lines
are free of sag that will trap water inside them
between the brew heads and the water tower.
WARNING:
Use the leveling legs to level the water
tower only. Do not use them to adjust the height. Do
not extend them higher than necessary.
Figure 10 - Attached Cable Support Plates
Figure 12 - Attaching the Water Hoses
Figure 11 - Leveling the Water Tower
NO sag is permitted in
water return lines
UCM cable
Right brew
head cable
Water return
line
Water supply
line
Water supply lines
Left brew
head cable
Figure 13 - Return Line Installation
Install the Water Tower (cont.)
18 Use the screws to attach the plates to the chassis as
shown.
19 Connect the brew head cables to the connectors inside
the chassis. The connectors are labeled right and left to
indicate the correct cable connection.
20 Replace the water tower top cover and side cover.