CGC, INSTALLATION INSTRUCTIONS
080820C
INSTALLATION INSTRUCTIONS
II13
Power Up the Brewer
18 Turn on the water supply valve.
19 Make sure that the circuit breaker supplying power to
the unit is on.
20 Turn the toggle switch on the back of the brewer to the
0/QPTJUJPO5IFXBUFSUBOLXJMMTUBSUUPmMM8IJMFUIF
UBOLJTmMMJOHJOTQFDUUIFXBUFSTVQQMZMJOFGPSMFBLT
21 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
When the water has heated,
Ready to brew
will be
displayed on the LCD screen.
22 Perform a brew cycle of a least 12 oz./350 ml to purge
any remaining air from the system. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank. Fill a coffee cup with water, using the hot
water faucet, to purge air from the hot water line.
IMPORTANT:
When operating the brewer at
higher elevations, reduce the factory set operating
temperature (200°F/92°C) by 2°F/1°C for each
1000 ft./300 m of elevation above 4000 ft./1200 m.
See the
PROGRAMMING GUIDE
section.