Curtis 1206-HB to
1268 Conversion
Installation Instructions
62-EZHB-AO WORK INSTRUCTIONS REV. 02
9/14/2018
Page 1: ...Curtis 1206 HB to 1268 Conversion Installation Instructions 62 EZHB AO WORK INSTRUCTIONS REV 02 9 14 2018...
Page 2: ...lug all connections to the factory controller and remove the three 13mm bolts securing the four large diameter wires Save these bolts they will be reused when installing the new controller 4 The facto...
Page 3: ...d holes mount the conversion plate to the vehicle heatsink 3 Using a small scraper or razor blade spread the three tubes of thermal compound included evenly over the new controllers heatsink 4 Using t...
Page 4: ...s Using a wire crimper and the two ring terminals included cut and re crimp the black and white 10awg wires coming from the motor 3 Using the supplied M6 bolts washers and lock washers secure the fiel...
Page 5: ...walk away relay and protection fuse 9 Using the supplied M5x20mm bolt washers lock washer and nut attach the walk away relay and fuse to the solenoid cover mounting tab as shown 10 Remove the pre cha...
Page 6: ...iginal hardware 14 Mount the new tow run switch mounting plate using an open hole in the vehicle frame right above the new controller using the included M6x25mm bolt washer lock washer and nut 13 Re c...