Page 1: ...1 Ed 0121 70702580 REV01 Silea Pre installation Silea MIXER Pre installation and installation manual SILEA 20 SILEA 30 ...

Page 2: ... BEFORE PURCHASING 3 2 TECHNICAL SPECIFICATIONS 5 3 INSTALLATION 7 Safety instructions 7 Symbols applied to the machine 8 Transport 9 Preliminary operations 9 Positioning 9 Serial number plate reading 10 Electrical connection 11 Wiring diagrams 13 4 FINAL OPERATIONS 18 Checking the installation is correct 18 The company cannot be held liable for any print or transcription errors reserving the righ...

Page 3: ...at the floor of the installation room is fireproof perfectly flat and capable of withstanding the weight of the appliance Fig 2 the installation room is dedicated and suitable to cooking food has adequate air ventilation complies with the current regulations on health and safety and systems in the workplace is protected from the weather has a maximum temperature of between 5 41 F and 35 C 104 F ha...

Page 4: ... The cable must have a maximum cross section of 10 mm2 in compliance with IEC EN 60335 2 42 2003 09 and must be yellow green must be grounded to the mains green yellow wire must be connected to a circuit breaker in compliance with the regulations in force 0 03A A type must be connected to an omnipolar circuit breaker allowing complete disconnection in overvoltage III category conditions Electrical...

Page 5: ...your hands into the bowl while the cycle is in progress if the protection is lifted during mixing the movement of both the spiral and the bowl is stopped 2 Bowl 3 Control panel 4 Wheel with brake 5 Wheel without brake 6 Power cable 7 Equipotential terminal 8 Dough breaking rod 9 Spiral 10 Shows the correct direction of rotation of the bowl Control panel A STOP button stops the rotation of both the...

Page 6: ...per minute mixing bowl 16 RPM spiral 110 RPM bowl diameter 360 mm 14 17 inc bowl height 240 mm 9 45 inc bowl capacity 24 43 litres 6 4 gal bowl diameter 450 mm 17 72 inc bowl height 260 mm 10 24 inc bowl capacity 41 35 litres 11 gal RPM revolutions per minute mixing bowl 16 RPM spiral 88 RPM Technical specifications mixer SILEA 30 mixer weight 103 kg 227 lb weight of packaging mixer 114 kg 251 3 l...

Page 7: ...remove damage or modify it These appliances are intended to be used for commercial applications for example in restaurant kitchens canteens hospitals and commercial companies such as bakeries butcher shops etc but not for the continuous and mass production of food To avoid risks if the power cable is damaged it must be replaced by the Retailer its service agent or qualified personnel Failure to fo...

Page 8: ...on Symbols applied to the machine Risk of electrocution Equipotential terminal Hazard due to moving parts 20K MAD E IN ITAL Y Mo d SIL 30KR C5 CP VO LTAC 3 400 50HZ KW 2 1 2020 S N SIL3 0K RC 5C P 20 01 0129 Notes ...

Page 9: ...abrasive products or sharp or pointed instruments Check that all the parts making up the product are in good condition and without any faults or breakages if that is not the case contact the Dealer for the procedures to follow Positioning Fig 6 Install the appliance in a room dedicated and suitable to the cooking of food having adequate air ventilation containing no flammable or explosive elements...

Page 10: ...W 2 1 2020 S N SIL30KRC5CP 20 01 0129 Installation Serial number plate reading Fig 7 The serial number is on the back of the appliance It provides important technical information that is vital in case of a request for maintenance or repair of the appliance please do not remove damage or modify it Model Electrical parameters Absorption Year of production Serial number ...

Page 11: ... equipotential system Fig 10 in compliance with the legislation in force This connection must be made between the various devices with the terminal marked with the equipotential symbol The cable must have a maximum cross section of 10 mm2 in compliance with IEC EN 60335 2 42 2003 09 and must be yellow green must be grounded to the mains green yellow wire must be connected to a circuit breaker in c...

Page 12: ...5 0 45 3 3 3x1 5 2x16 three phase 3x230V50 60Hz 0 75 0 45 1 9 4x1 5 3x16 three phase 3x400V N 50 60Hz 0 75 0 45 1 1 5x1 5 4x16 30 single phase 230V 50 60Hz 1 1 0 66 4 8 3x1 5 2x16 three phase 3x230V50 60Hz 1 1 0 66 1 8 4x1 5 3x16 three phase 3x400V N 50 60Hz 1 1 0 66 2 6 5x1 5 4x16 single phase 208v 50 60Hz 1 1 0 66 5 3 3xAWG16 3x16 three phase 3x208V50 60Hz 1 9 1 14 5 3 4xAWG16 4x16 ...

Page 13: ...R S T N Wiring diagrams Abbreviation Description SB1 Stop button SB2 ON button KM1 Contactor FR1 Internal thermal protection SQU1 Safety microcontact Abbreviation Description SB1 Stop button SB2 ON button KM1 Contactor FR1 Internal thermal protection SQU1 Safety microcontact ...

Page 14: ...eviation Description SB1 Stop button SB2 ON button KM1 Contactor FR1 Internal thermal protection SQU1 Safety microcontact Abbreviation Description SB1 Stop button SB2 ON button KM1 Contactor FR1 Internal thermal protection SQU1 Safety microcontact ...

Page 15: ... Ed 0121 70702580 REV01 Silea Pre installation 3 208V L1 L2 L3 Wiring diagrams Abbreviation Description SB1 Stop button SB2 ON button KM1 Contactor FR1 Internal thermal protection SQU1 Safety microcontact ...

Page 16: ...k with a all the boxes of the table below this will confirm the installation is complete and correct Positioning checks Is the installation room adequate and compliant with regulations minimum maximum temperature etc Is the appliance resting on a perfectly level floor Have the minimum distances stated been complied with Has the protective film been removed from the surfaces Electrical checks Does ...

Page 17: ...DGES POSITIONED CORRECTLY the bowl will rotate in the direction of the arrow If after connecting the wires to the plug the bowl rotates in the wrong direction swap two phases over e g black wire with brown wire BRIDGES POSITIONED INCORRECTLY the bowl will rotate in the opposite direction B Checking the correct direction of rotation of the bowl Make sure that the bowl rotates in the direction of th...

Page 18: ... THE VALIDITY OF THE SAME STARTS FROM THE INVOICE DATE AND NOT FROM THE ACTUAL INSTALLATION DATE C Checking the operation and first start up Start the appliance following the instructions in the Use and Maintenance manual annexed monitor it during the whole test and check that all the electrical components work properly ...

Page 19: ...19 Ed 0121 70702580 REV01 Silea Pre installation ...