Key Pre-Delivery Activities
v
Cat. No. 01021716
Pre-Delivery Activity: Prepare and Flush Water Treatment Components
CAUTION! All RO Membranes will require a 24-hour flush to drain. All flushing of membranes
and filters must be done with chlorine-free, filtered, softened water.
Activity
Executive
Aqua-Cleer
Filter
Executive
Aqua-Cleer RO
Executive LC-
100 RO
Executive AC50
RO
Flush the filters to drain for at least five (5) min-
utes with filtered soft water
c
Verify that system includes Automatic Shut-Off
Valve (P1021587)
c
c
c
Verify that system includes Check Valve
(P1021588)
c
c
c
Verify system includes Air Gap (44403001 or
equivalent) for system drain
c
c
c
Flush the RO cartridge to a drain with filtered
softened water for 24 hours prior to installation
c
c
c
Flush the carbon block filter to drain for at least
five (5) minutes until there are no more carbon
fines observed.
c
Activate the Preferred Series 250 cartridge and
thoroughly flush per the detailed instructions
c
Flush the pre-carbon filter and sediment filters
to drain
c
Flush the carbon post filter to drain
c
c
c
Sanitize and flush the storage tank
c
c
c
Pre-Delivery Activity: Prepare and Flush Cooler for Service
Activity
Executive Cooler
Unpack the Cooler.
c
Inspect the Cooler for any shipping damage.
c
Flush and test the Cooler.
c
See the appendixes for details about these activities.