ASSEMBLY INSTRUCTIONS
STEP 2
-----------------------------------------------------------------------------------
Use screw assemblies to attach the middle portion of left back leg (5) (LB) and the right back leg (17) (RB) to the
upper shelf (16) as shown below.
• Note: it is important to not fully tighten the screws during initial assembly of the parts. Wait until
the end of step 13 to complete assembly by fully tightening all of the screws.
• Note: Legs are punched with markings to indicate position for assembly, (LB, RB, LF, RF).
• Note: Assembly for the next 4 steps is done with the unit laying on its’ back.
STEP 3
-----------------------------------------------------------------------------------
Use screw assemblies to attach the lower shelf (19) assembly to the lower portion of the left back leg (5) (LB)
and the right back leg (17) (RB). Note that the locking casters (20) are to the right and only side screws are
installed into the legs for this step.
6
2
22
x 2
x 2
Summary of Contents for CGWM-090
Page 4: ...EXPLODED VIEW 4...