2. INSTALLATION
To properly install the Managed Switch, please follow the procedures listed
below. Procedures covered in this chapter are described below in separate
sections.
Installation Requirements
Unpacking the Managed Switch
Installing the Managed Switch
Powering on the Managed Switch
Connecting the Managed Switch to the Network
2.1 Installation Requirements
Basic requirements for installation are as follows:
Environmental conditions
One power outlet
Proper ventilation
Proper isolation to electrical noise, radio, etc..
UTP cables should not run in the same duct with power and
phone line cables
Required SFP Transceivers or UTP cables
2.2 Checking the Package Contents
Unpack the package carefully and check the package contents. The package
should contain the following items:
Items included in standard package:
1 Managed Switch
1 Documentation CD
1 Power Adaptor
If any of the above items is found missing or damaged, please contact your local
sales representative for support or replacement.