CTI SD2-NH3 Installation And Operation Manual Download Page 8

8

SD2-NH3

40-200 mV

mVDC

Black

Red

-

+

Gas sensing element

Span adjustment

Pump

Solenoids

Fresh air sample port

Hosebarb connection

for sample air port

Top sensor board:

Fault (red) LED:

• 

On steady if supply voltage is less 

than 10VDC.

Status (amber) LED:

• 

Blinks once per second if RFI is 

detected.

Power (green) LED:

•  On steady to Indicate Power.
• 

Blinks once per second for 60 

seconds during power-up.

•  Blinks once per second 

continuously if supply voltage is 

too low.

Figure 3

Zero 

adjustment

Bottom back board:

Status (amber) LED:

•  On steady during room sample
•  Blinks once per second during 

fresh air purge.

Power (green) LED:

•  On steady to Indicate Power.
• 

Blinks once per second for 60 

seconds during power-up.

•  Blinks once per second 

continuously if supply voltage is 

too low.

•  Blinks twice per second in 

calibration mode (4 minute 

timeout delay).

Summary of Contents for SD2-NH3

Page 1: ...Installation and Operation Manual SD2 NH3 SAMPLE DRAW AMMONIA SENSOR FOR CONTROLLED ATMOSPHERE ROOMS...

Page 2: ...nly in the manner described in this manual If the equipment is used in a manner not specified by Calibration Technologies the protection provided by the equipment may be impaired This equipment should...

Page 3: ...wy Columbia MO 65201 phone 866 394 5861 email sales ctiengineeing com website ctiengineering com General description 4 Installation 4 Locating the SD1 NH3 4 Installation guidelines 4 Fresh air port in...

Page 4: ...sealed in potting compound protecting sensitive electronic components and copper tracing from corrosion An external fresh air sample tube and hardware are included with the SD2 NH3 Tube length provide...

Page 5: ...conduit to the conduit body A 5 Attach the conduit body A to the sample air inlet port B at the bottom of the sensor enclosure 6 Take the finished subassembly and line up the 1 2 conduit with the 1 2...

Page 6: ...ays use 3 conductor insulated stranded shielded copper cable Do not pull sensor wiring with AC power cables This can cause electrical interference If cable runs cannot be made without a splice all spl...

Page 7: ...out after 4 minutes Zero Calibration After the sensor is installed and has been powered up for a minimum of 8 hours the unit can be zero calibrated by the following Note Place bottom back board in ca...

Page 8: ...eady to Indicate Power Blinks once per second for 60 seconds during power up Blinks once per second continuously if supply voltage is too low Figure 3 Zero adjustment Bottom back board Status amber LE...

Page 9: ...CTI All calibrations should be logged During every calibration interval disassemble the inlet filters and clean with compressed air Always disconnect power at the controller before performing any wiri...

Page 10: ...ft Application dependent but generally less than 3 per month Linearity 0 5 of full scale Repeatability 1 of full scale Wiring Connections 3 conductor shielded stranded 18 AWG cable General Cable C2535...

Page 11: ...uct by any person other than an authorized dealer or contractor or the installation of unapproved parts on the product The obligations set forth in this warranty are conditional on a proper storage in...

Page 12: ...ctiengineering com 866 394 5861 SD2 NH3 DOC1 2 20200923...

Reviews: