-
4
-
w w w . C T C U . c o m
Chassis Installation
The contact closure media converter units can be placed in CH01M 1-slot
with console, CH02M 2-slot with console, CH02-NMC 2-slot with NMC or
the full CH08 or CH20 chassis.
Follow all ESD precautions when handling the card and SFP modules.
About SFP & SFP Installation
FRM220-CCF40
accepts any SFP units that comply with the MSA
standard. Follow all ESD precautions when handling the card and pluggable
modules. Fiber optic components and cables are very sensitive to dirt, dust
and mishandling, especially in high-speed networks. Dirty or mistreated
fiber may cause errors and an unwanted degradation of signal quality.
Remove the dust caps on SFP and patch cables only when ready to plug in
optical cables.
Installation
CTC Union supplied SFP modules are of the Bale Clasp type. The bale
clasp pluggable module has a bale clasp that secures the module into the
SFP cage.
Inserting a Bale Clasp SFP Module into the cage
Step 1. Close the bale clasp upward before inserting the pluggable
module.
Step 2. Line up the SFP module with the port, and slide it into the
cage.
Removing a Bale Clasp SFP Module
CH02-NMC Chassis
AC, DC, 2AC, 2DC,
or AD
FRM220-CH20
CH02M Chassis
AC, DC, 2AC,
2DC, or AD
Summary of Contents for FRM220-CCF20
Page 1: ......