background image

Declaration of conformity

Försäkran om överensstämmelse

Déclaration de conformité

Declaration of conformity

Konformitätserklärung

Enertech AB

Box 313

S-341 26 LJUNGBY

försäkrar under eget ansvar att produkten

confirme sous sa responsabilité exclusive que le produit,

declare under our sole responsibility that the product,

erklären in alleiniger Verantwortung, dass das Produkt,

CTC EcoZenith

som omfattas av denna försäkran är i överensstämmelse med följande direktiv,

auquel cette déclaration se rapporte est en conformité avec les exigences des normes suivantes,

to which this declaration relates is in conformity with requirements of the following directiv,

auf das sich diese Erklärung bezieht, konform ist mit den Anforderungen der Richtlinie,

EC directive on:

Pressure Equipment Directive  97/23/EC, §  3.3

(AFS 1999:4, § 8)

Electromagnetic Compatibility (EMC) EN 2004/108/EC

Low Voltage Directive (LVD) EN 2006/95/EC

Överensstämmelsen är kontrollerad i enlighet med följande EN-standarder,

La conformité a été contrôlée conformément aux normes EN,

The conformity was checked in accordance with the following EN-standards,

Die Konformität wurde überprüft nach den EN-normen,

EN 14731:2006

EN 55014-1 /-2

EN 3834-2:2005

EN 61 000-3-2

EN 15614-1:2004

EN 60335-1, 2-21

EN 1418

EN 50366:2002, +A1

EN 287-1:2004

EN 10 204, 3.1B:2005

EN 10 025-1, -2, S 235 Jr-G2:2004

         

Ljungby 2009-11-20

Kent Karlsson

Technical Manager

Summary of Contents for EcoZenith 510

Page 1: ...Providing sustainable energy solutions worldwide Installation and maintenance instructions CTC EcoZenith C 530 510 161 505 77 1 2014 01 16...

Page 2: ......

Page 3: ...Installation and maintenance instructions CTC EcoZenith C 530 510 161 505 77 1 2014 01 16...

Page 4: ...enith C 530 design______________________________ 8 3 CTC EcoZenith 510 design__________________________________ 9 4 Operation and maintenance______________________________ 10 4 1 Safety valve for the...

Page 5: ...is a buffer tank with a volume of just over 500 litres and has among other features inbuilt solar and hot water coils for use for example as the first tank in a wood boiler system CTC EcoZenith 510 i...

Page 6: ...round it for fitting the insulation and plastic top See section Transport unpacking and installation in the section for the installation technician CTC EcoZenith C 530 and 510 should also not be place...

Page 7: ...of about 40 metres of finned copper coil for heating water This pre heats the water through the lower tank and then passes through the upper tank for the final temperature increase There are two coils...

Page 8: ...mperature water in the lower part for the best heat exchange of solar heat Lower tank connections A heat pump and solar coil can be connected to the lower part of the tank Water to be heated by a wood...

Page 9: ...er CTC EcoZenith 510 is prepared with fitting for immersion heater Immersion heaters are accessories Insulation The tank is insulated with 90 mm thick moulded polyurethane foam to minimise heat loss T...

Page 10: ...ockwise Air must be applied to a closed system 4 3 Operation stop If there is a risk of the water freezing when the system is not in use all the water must be drained from the tank and radiator system...

Page 11: ...he functions and settings with the property owner and answer any questions Both CTC EcoZenith C 530 510 and you will benefit by the user having good knowledge of how the application works and should b...

Page 12: ...e connection sleeve Cover plates for upper and lower tank connections 8pcs Cover plates for solar connections 2pcs Insulation for connection sleeves that are not used Screw 4 2 x 14 graphite grey 25 o...

Page 13: ...and they are easier to fit if there is space around the unit Begin with the left rear insulation Turn out the insulation locate it in the pockets in the front insulation and then turn it in against th...

Page 14: ...The illustration shows EcoZenith I 550 Zinc grey screw 4 off Fit the plastic top at the front and tip it backwards to locate it under the mixing valve actuator Fit the 4 provided zinc grey screws in t...

Page 15: ...tter freezing risk must be avoided and it must be open pressureless Radiator system filling valve Fit the filling valve between the cold water connection and the radiator return pipe or between the co...

Page 16: ...6 x 935 x 1700 Weight kg 239 134 Insulation Polyurethane PUR mm 90 Hot water capacity 40 C 22 l min 600 523 Tank temp 55 C HP EA125 permitted Tank temp 65 55 C electrical power 24 kW permitted litre l...

Page 17: ...water 22 mm 7 Hot water circulation 22 mm 8 Connection for mixing valve prio 2 28 mm Connections for prio 1 and return pipe behind the front insulation G 1 int 9 Immersion heater connection G 2 int 10...

Page 18: ...es is in conformity with requirements of the following directiv auf das sich diese Erkl rung bezieht konform ist mit den Anforderungen der Richtlinie EC directive on Pressure Equipment Directive 97 23...

Page 19: ......

Page 20: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 161 421 50 10 01...

Reviews: