CTC EcoAir 510M 230V 1N~

Checklist

The checklist must always be completed by the installation engineer

•  If service is needed, you may be required to provide this document.

•  Installation must always be done according to the installation and maintenance instructions

•  Installation must always be carried out in a professional manner

Following installation, the unit must be inspected and functional checks performed as 

indicated below:

Pipe installation

 

†

Heat pump filled, positioned and adjusted in the correct manner according to the 
instructions.

 

†

The heat pump is positioned so that it can be serviced

 

†

Capacity of the charge/radiator pump (depending on type of system) for the flow required.

 

†

Open radiator valves (depending on type of system) and other relevant valves.

 

†

Tightness test

 

†

Bleed the system

 

†

Check proper operation of the requisite safety valves

 

†

Action taken to deal with condensation water

Electrical installation

 

†

Power switch

 

†

Correct tight wiring

 

†

Requisite sensors fitted

 

†

Heat pump activated and started

 

†

Accessories

Customer information (adapted to the relevant installation)

 

†

Start-up with customer/installer

 

†

Menus/controls for selected system

 

†

Installation and maintenance manual supplied to the customer

 

†

Check and filling, heating circuit

 

†

Information on fine adjustments

 

†

Alarm information

 

†

Functional test of safety valves fitted

 

†

Register your Installation Certificate at ctc-heating.com.

 

†

Information on procedures for fault registration

________________________________________________ ____________________________________________

Date/Customer 

     Date/Installer

Summary of Contents for EcoAir 500M

Page 1: ...ions worldwide 162 605 07 1 2020 10 12 Important Read carefully before use keep for future reference Translation of the original instructions Installation and Maintenance Manual CTC EcoAir 510M Modula...

Page 2: ......

Page 3: ...Installation and Maintenance Manual CTC EcoAir 510M Modulating Air Water Heat Pump 230 V 1N...

Page 4: ..._____________________________________ 19 5 1 Pipe connection_______________________________________________19 5 3 Circulating pump heat carrier__________________________20 5 2 Example of connection to...

Page 5: ...rge defrosting which keeps the evaporator coil free from ice to maintain high efficiency EcoDesign information relating to the current combination current package can be downloaded from www ctc se eco...

Page 6: ...y be disturbed by the compressor and vibrations 1 3 Recycling The packaging must be deposited at a recycling station or with the installation engineer for correct waste management Obsolete products mu...

Page 7: ...ly be installed and serviced by a qualified electrician If the supply cord is damaged it must be replaced by the manufacturer its service agent or similarly qualified persons in order to avoid a hazar...

Page 8: ...red Open radiator valves depending on type of system and other relevant valves Tightness test Bleed the system Check proper operation of the requisite safety valves Action taken to deal with condensat...

Page 9: ...rent connection options available for the CTC EcoAir 510 230 V 1N In some cases a CTC Converter or CTC Basic Display may be needed See the chapter on Connecting the control system CTC EcoAir 510 230 V...

Page 10: ...ower Weight with without packaging Sound power 3 1 At 35 C water temperature 7 20 rps 7 C 90 rps According to EN 14511 2 At 120 rps from factory max 90 rps Incl Grundfos UPM GEO 25 85 charge pump 3 So...

Page 11: ...EcoAir 510M 230V 1N CTC EcoAir 510M A 486 B 1155 C 1245 D 188 E 1080 F 308 G 476 H 451 I 28 J 85 K 545 L 10 L 42 A B C D E H L G F J I K L 3 1 Dimensions diagram Top view Condensation drain G1 Bottom...

Page 12: ...re sensor B101 7 Compressor 8 Hot gas sensor B21 9 High pressure switch 10 High pressure sensor B100 11 4 way valve 12 Condenser 13 Primary flow sensor B1 14 Return sensor B7 15 Drying lter 16 Schrade...

Page 13: ...13 CTC EcoAir 510M 230V 1N 19 2 3 5 6 9 14 7 10 11 12 13 15 16 17 18 20 27 3 4 Component location...

Page 14: ...at angives g ller ovanst ende 1 2 JW 2018 04 05 Bipack EA614 Bipack EA A 588618 SJ blad 1 2 27 1 3 4 21 24 25 26 22 20 23 8 10 1 6 1 EMC lter 2 Fan 3 Frequency converter 4 Defrosting sensor in evapora...

Page 15: ...Both you and the heat pump benefit from a user who has completely understood how the system operates and should be maintained The installation must be carried out in accordance with current MCS standa...

Page 16: ...at pump so that noise from the compressor and fan does not disturb the surroundings Do not place the heat pump right next to a bedroom window patio or fence Take the distance to the nearest neighbour...

Page 17: ...the ground 70 100 cm deep Place a moisture barrier in the hole on the side against the foundations of the building Half fill the hole with crushed stones and lay concrete blocks or similar Mark the ce...

Page 18: ...llar it is advisable to route the condensation water to a floor drain indoors to be performed according to the applicable rules The pipe should be installed with a slope towards the house and above th...

Page 19: ...le as an accessory The recommended hose length is 1000 mm to prevent noise transmission into the property and to allow for movement of the heat pump Pipes installed outside should be insulated with at...

Page 20: ...pump heat carrier The pump transports the heat from EcoAir to CTC EcoZenith If the outdoor temperature is below 2 C the pump runs constantly to eliminate any risk of freezing If the product installed...

Page 21: ...This is to ensure that the right differential for the current outdoor temperature is produced according to the table At outside temp C 10 5 0 5 7 10 CTC EcoAir 510 Primary flow 35 C flow 0 21 l s 4 C...

Page 22: ...ation connection The communication cable used is the provided LiYCY TP which is a 4 conductor shielded cable where the communication bearing conductors are of twisted pair type When connecting CTC Eco...

Page 23: ...installing a heat pump dip switch 2 should be set to the ON position Factory setting 6 1 6 Termination for connection of heat pumps in series In a series connection DIP switch 2 must be set to the OFF...

Page 24: ...connected in series Display setup Green White Brown Remove the jumper PE connect the shielding to the next heat pump here Connect each cable to the next heat pump in the series connection here Make s...

Page 25: ...55 PRO and CTC EcoLogic PRO Family M L can control several heat pumps CTC EcoZenith i250 i255 CTC EcoZenith i350 i360 CTC EcoZenith i550 i555 Pro CTC EcoLogic PRO Family M L When connecting CTC EcoAir...

Page 26: ...and use the arrow to scroll up and down until the actual address of the heat pump is shown HP2 Press OK Example of a system with 3 heat pumps 6 3 Connecting the control system 6 3 1 De ne number of he...

Page 27: ...Go to Service Set Address Select Actual address press OK and press the down arrow until the current heat pump appears HP1 Press OK Select New address press OK and press the up arrow until the actual a...

Page 28: ...umps are numbered and energised they should be displayed when you press the heat pump symbol in the menu Operation data If any heat pump does not appear in the menu communication with the heat pump fa...

Page 29: ...Heat Pump row will go dark In this example we have assumed that the heat pump is called A1 which is the factory default If the heat pump has already been renumbered then select this number instead 6 3...

Page 30: ...the arrow up until A1 is displayed Press OK After pressing OK A1 disappears and the Select Rename Heat Pump row will go dark The heat pump is now numbered A3 In this example we have assumed that the h...

Page 31: ...communication with the heat pump fails It may be because it has not been numbered as described above If you do not know the name of the heat pump you can reset the numbering by using the Select Renam...

Page 32: ...32 CTC EcoAir 510M 230V 1N 6 4 Wiring diagram 230 V 1N A3...

Page 33: ...33 CTC EcoAir 510M 230V 1N...

Page 34: ...34 CTC EcoAir 510M 230V 1N 6 5 Wiring diagram 230 V 1N A4...

Page 35: ...sensor NTC 50 B22 Suction gas sensor Type 1 NTC NTC 015 B100 High pressure sensor B101 Low pressure sensor C1 Condenser compressor 1 phase C2 Condenser E10 Compressor heater E11 Condenser tray heater...

Page 36: ...125 6 18 120 7 13 115 8 26 110 9 59 105 11 17 100 13 06 95 15 33 90 18 1 85 21 4 80 25 4 75 30 3 70 36 3 65 43 6 60 52 8 55 64 1 50 78 3 45 96 1 40 119 35 147 30 184 25 232 20 293 15 373 10 479 5 619...

Page 37: ...0 5960 55 7080 50 8450 45 10130 40 12200 35 14770 30 18000 25 22000 20 27100 15 33540 10 41800 5 52400 0 66200 5 84750 10 108000 15 139000 20 181000 25 238000 Temperature C NTC 22 k Resistance 40 5830...

Page 38: ...tight 3 Check that sensors and the charge pump are connected to the power source 4 Energise the heat pump by switching on the operating switch the main switch Once the system has heated up check that...

Page 39: ...at pump is adapted using modulating operation according to the actual energy requirement The compressor runs constantly with the correct power and thereby minimises the number of start and stop period...

Page 40: ...ing operation and defrosting The condensation water tray is equipped with an electric heating coil which keeps the tray free of ice when it is freezing outside The condensation water tray is located a...

Page 41: ...and information texts from the CTC EcoAir 510M are displayed in the product which is used to control it you should therefore consult the manual for that product Circulation and defrosting If the circ...

Page 42: ......

Page 43: ......

Page 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 012 162 605 07 1 2020 10 12...

Reviews: