
26
CTC EcoAir 510M 230V 1N~
RJ-12 RJ-45
1. System disconnected from power.
2. Power up the control (CTC EcoLogic or
EcoZenith i555 Pro) as well as CTC EcoAir 510M which
will be numbered as Heat Pump 2 (HP2).
3. Wait for about 2 minutes.
4. Go to "Installer/Service/Set Address".
Select "Actual address", press OK and press the down
arrow until the current heat pump appears (HP1) Press
OK.
Select "New address", press OK and use the arrow to
scroll up and down until the actual address of the heat
pump is shown (HP2). Press OK.
Example of a system with 3 heat pumps.
6.3 Connecting the control
system
6.3.1 Defi ne number of heat pumps
Define the heat pumps in the controlling product’s display
under: "Advanced/Define system/Heat pump".
Set the heat pumps contained in the system to position
"On".
6.3.2 Numbering CTC EcoPart 510M to HP2
Applies to control launched in October 2020
with three connectors on the back of the display.
2 RJ-45 and 1 RJ-12.
!
*CTC EcoZenith i550 Pro
does not control
CTC EcoAir 610M.
HP1
HP1
HP1
HP1
HP1
HP1
Summary of Contents for EcoAir 500M
Page 2: ......
Page 3: ...Installation and Maintenance Manual CTC EcoAir 510M Modulating Air Water Heat Pump 230 V 1N...
Page 32: ...32 CTC EcoAir 510M 230V 1N 6 4 Wiring diagram 230 V 1N A3...
Page 33: ...33 CTC EcoAir 510M 230V 1N...
Page 34: ...34 CTC EcoAir 510M 230V 1N 6 5 Wiring diagram 230 V 1N A4...
Page 42: ......
Page 43: ......